Loading...
HomeMy WebLinkAbout1/9/2024 - Public Service Center Replacement Plan - Phase 2Public Service Center Replacement Plan-Phase 2 January 9, 2024 ROANOKE ~COUNTY VIRGIN !,\~ Fs r 1818 History of Project • 2016 study was completed by Thompson & Litton to develop a replacement plan for the Public Service Center on Kessler Mill Road • This plan included moving departments to multiple locations including the Cold Storage Building located at 5285 Hollins Road, purchased by the County in 2017 ($975,000) • In 2019, Lumsden Associates developed a concept site plan utilizing 5 acres (2 parcels) at 5305 Hollins Road, adjacent to 5285 Hollins Road, subsequently purchased by the County for the continued expansion of the Public Service Center ($280,000 & $720,000) • New Parks Maintenance Shop was completed in 2021 at Green Hill Park • New Stormwater Operations Building was completed in 2022 at the Kessler Mill location • Expansion to Fleet Center for General Services, Solid Waste, Comm Shop, and Welding Shop was completed in 2022 at the Hollins Road location • The Parks and Recreation project would include constructing a 10,000 sq ft office building, renovate the existing warehouse for parks shops and special event storage along with building 7,000 sq ft equipment storage • The office building component for PRT was replicating the General Services addition ROANOKE~COUNTY 2 -VIIU,INIA ~ FST l!!lR 2019 Lumsden Associates -Concept Site Plan ROANOKE~COUNTY 3 VIRGINIA ~ fST. 1838 Continued History of Project • The project was within budget in April 2023 at 50% plans, though a significant amount of mechanical engineering still needed to be completed • In fall of 2023, with 90% plans completed, a revised construction cost estimate for $6,726,275 was generated (does not include soft costs or contingency). This revision indicated an approximate $1 million construction cost increase since the April estimate • The architect attributed the cost increases to HVAC design, mistake on the generator estimate, error estimating the 7,000 sq ft equipment storage building, and inflationary construction cost increases • Staff brought in a local contractor to verify the cost estimate and to make recommendations on construction options. Their estimate was $7,902,605 to build the current plan ROANOKE~COUNTY 4 VIRC I N I A ~ h i 1818 I I _J_ __ ___ ------------------------------------- Site Plan r- 1 I I ICM.fUE.IIW>D.l!I[ fNII IUQI tNIII NORFOLK SW/HEHN RAILWAY COI.IPANY ... ..,..""' ---------------------=~:: ~,_J_.S,;::::;;;::::;;;::::;;::::=;=::,_--1 11£W ,ad , 1!!,1111' <ITICE ADl)l1POII -------------- \ -- --_......_ - ------- HOLUNS ROAD (SEC. RTE 601) VARWU' R/W Value Engineering Staff worked with the architect to identify cost saving measures: • Reduced size of maintenance areas • Reduced storage and shop areas • Downgraded HVAC equipment • Changed location of HVAC equipment • Change maintenance equipment stalls from steel to wood • Looked at an option to renovate warehouse for the office building • Reduced parking spaces • Ceiling tile size change • Eliminated the generator • Reduced the number of toilet fixtures • Eliminating the masonry facade Using all of these options, the architect stated they could not come close to making up $1,000,000 in savings. At this point, the project was becoming not functional for PRT and adding future maintenance costs Alternative Option • Look for an existing 10,000 sq foot office building to purchase • 4818 Starkey Rd is the only known option available for sale in Roanoke County • Renovate warehouse for Parks shops, storage and build a laydown yard and equipment stalls • Expand Starkey Park or Shell Park maintenance areas • As part of due diligence will evaluate an external elevator ROANOKE~COUNTY 7 VIRCINIA ~ 1ST 18!8 Public Service Center Capital Project-Phase 2 Description Phase 2 Bond Proceeds* $ 4,775,000 Cash 2,600,000 Budgeted Revenues $ 7,375,000 Expenditures to date plus encumbrances 226,393 Remaining Balance $ 7,148,607 *Review and verification by Virginia Resource Authority needed and an amendment to the County bond ordinance for approval of building purchase required Alternative Option-Budget D . . Alternative Expenditures escnpt1on Purchase of building $ 1,990,000 Upfit of building 575,000 Starkey Park Maintenance Yard Improvements 200,000 Warehouse Improvements & Maintenance Yard 3,250,000 Due diligence 25,000 Contingency 310,000 Total $ 6,350,000 Budget Savings-Phase 2 Remaining Project Budget $ 7,148,607 Additional funding required for current project 1,000,000 + Revised total cost of current project $ 8,148,607 + Project with building purchase option (6,350,000) Projected savings $ 1,798,607 + ROANOKE ~COUNTY 10 VIRGI N IA ~ fST 18.!8 Recommendation • Due diligence on purchase option • Evaluate options for park maintenance storage • Review and verification by Virginia Resource Authority needed and an amendment to the County bond ordinance for approval of building purchase required • Secure option for existing building at 4818 Starkey Road prior to it being formally marketed ROANOKE~COUNTY 11 -V I RG I NIA~ FS T 18)8 Questions