HomeMy WebLinkAbout10/22/2024 - VDOT Attachment B - Roanoke County Updated VDOT Transportation ProjectsC o u n t y o f R o a n o k e , V i r g i n i a
County of Roanoke, Virginia
Updated VDOT Transportation Projects
A number of projects within the Capital Improvement Program (CIP) receive funding from and/or are administered by the Virginia
Department of Transporta�on. Details on VDOT Transporta�on Projects in the CIP can be found below.
Project Name:Fallowater Lane Extension / Ridge Top Road
Funding Sources:VDOT UPC:112304 Project Status:
County Revenue Sharing $1,422,297 Administered By:Roanoke County Preliminary Engineering Complete
VDOT Revenue Sharing1 $1,422,297 County-Funded Portion:32.77%Right of Way Complete
SSYP5 $1,495,521 Construction Complete
Total Project Estimate:$4,340,115
Project Description:
Project Name:Glade Creek Greenway through Vinyard Park West
Funding Sources:VDOT UPC:122101 Project Status:
County Match $192,280 Administered By:Roanoke County Preliminary Engineering Complete
TE/TAP2 $769,122 County-Funded Portion: 20.00% Right of Way
Total Project Estimate:
N/A
November 2024
Project Description:
$961,402 Construction
Construct a 0.4-mile segment of the Glade Creek Greenway through Vinyard Park West.
Beginning at Route 419, this project upgrades the private driveway of Chuck E. Cheese to public road standards and
constructs a new section between the end of the private driveway and Almond Road, an existing private road. Almond Road
was rebuilt to public standards to the intersection of Chevy Road, an existing public road.
Page 1 of 6
Attachment B
C o u n t y o f R o a n o k e , V i r g i n i a
Project Name:East Roanoke River Greenway Phase 1 - 3226 Highland Road
Funding Sources:VDOT UPC:91191 Project Status:
County Match $193,250 Administered By:Roanoke County Preliminary Engineering Complete
TE/TAP2 $773,000 County-Funded Portion:7.82%Right of Way Complete
RSTP/STBG3 $1,505,371 Construction Complete
Local Funds $0
Total Project Estimate:$2,471,621
Project Description:
Project Name:East Roanoke River Greenway - Blue Ridge Parkway Crossing along Highland Road
Funding Sources:VDOT UPC:113356 Project Status:
County Match $254,213 Administered By:Roanoke County Preliminary Engineering Complete
TE/TAP2 $636,720 County-Funded Portion:28.53%Right of Way Complete
Construction Underway
Total Project Estimate:$890,933
Project Description:
Phase 1 is complete of a 0.40-mile section of the greenway across Explore Park property owned by the Virginia Recreational Facilities
Authority adjacent to the Blue Ridge Parkway, including a trailhead/parking lot on Highland Road.
Construction of a 0.30-mile section of the East Roanoke River Greenway along Highland Road that will cross beneath the Blue Ridge Parkway
through an existing overpass. Completion is anticipated to be complete in early 2025 .
Page 2 of 6
Attachment B
C o u n t y o f R o a n o k e , V i r g i n i a
Project Name:East Roanoke River Greenway - Blue Ridge Parkway/Highland Road to Explore Park
Funding Sources:VDOT UPC:110155 Project Status:
County Match $707,085 Administered By:Roanoke County Preliminary Engineering Complete
FLAP6 $2,723,000 County-Funded Portion:20.25%Right of Way Complete
Private Contributions $20,000 Construction Underway
RVRA and VRFA Easement
Value*$42,000
Total Project Estimate:$3,492,085
Project Description:
Project Name:East Roanoke River Greenway - Explore Park to Rutrough Road
Funding Sources:VDOT UPC:113567 Project Status:
RSTP/STBG/CRF3 $4,795,308 Administered By:Roanoke County Preliminary Engineering Complete
Total Project Estimate:$4,795,308 County-Funded Portion:0.00%Right of Way
Construction
N/A
November 2024
Project Description:
Construct of a 1.7-mile section of the Roanoke River Greenway from the 3400 block of Highland Road near the intersection with Rutrough
Road, through property owned by the Roanoke Valley Resource Authority, connecting to a Federal overlook, passing underneath the
Roanoke River Parkway, crossing properties owned by the National Park Service and ending at Explore Park. A trailhead/parking lot is
proposed on Rutrough Road. *The RVRA and VRFA Easement Value is a non-cash match to receive FLAP funds and is not reflected in County financial
system. Completion is anticipated to be complete in early 2025.
Construction of 1.50 miles of the greenway through Explore Park to Rutrough Road. Construction is anticipated to begin in November 2024.
Page 3 of 6
Attachment B
C o u n t y o f R o a n o k e , V i r g i n i a
Project Name:West Roanoke River Greenway Phase 1 - West Riverside Drive Trailhead to Kingsmill Drive
Funding Sources:VDOT UPC:97171 Project Status:
RSTP/STBG3 $7,343,229 Administered By:Roanoke County Preliminary Engineering Complete
SMART SCALE4 $4,542,105 County-Funded Portion:0.00%Right of Way Complete
Open Container $499,166 Construction Underway
Total Project Estimate:$12,384,500
Project Description:
Project Name:Williamson Road Pedestrian Improvements, Peters Creek to Plantation
Funding Sources:VDOT UPC:111317 Project Status:
County match $54,356 Administered By:VDOT Preliminary Engineering Complete
TE/TAP2 $217,424 County-Funded Portion:2.81%Right of Way
SMART SCALE4 $1,662,220 Construction
Complete
Complete
Total Project Estimate:
Project Description:
Phase 1 is a 0.60-mile section of greenway proposed with a trailhead parking lot on West Riverside Drive and will extend east
along the Roanoke River to the existing greenway in the City of Salem across from Kingsmill Drive. Construction is anticipated
to be complete by summer of 2025.
$1,934,000
Sidewalk was constructed between new pedestrian signals at Peters Creek Road and the existing shared use path
on Plantation Road.
Page 4 of 6
Attachment B
C o u n t y o f R o a n o k e , V i r g i n i a
Project Name:Dry Hollow Road Safety Improvements
Funding Sources:VDOT UPC:107309 Project Status:
County Revenue Sharing $3,251,793 Administered By:VDOT Preliminary Engineering Underway
VDOT Revenue Sharing1 $3,251,793 County-Funded Portion:43.74%Right of Way Anticipated in FY 2026
SSYP5 $930,217 Construction Anticipated in FY 2027
Total Project Estimate:$7,433,803
Project Description:
Project Name:Starkey Road/Buck Mountain Road Intersection Improvements
Funding Sources:VDOT UPC:113144 Project Status:
County Revenue Sharing $573,278 Administered By:VDOT Preliminary Engineering Complete
VDOT Revenue Sharing1 $573,278 County-Funded Portion:9.81%Right of Way Complete
SSYP5 $13,444 Construction Complete
RSTP/STBG3 $2,098,115
SMART SCALE4 $2,583,365
Total Project Estimate:$5,841,480
Project Description:
Improve safety by reinforcing the roadway along the creek and widening the roadway under the railroad bridge near the
intersection of West River Road.
This project converted the unsignalized "T" intersection at Starkey Road and Buck Mountain Road to a single lane
roundabout. Pedestrian accommodations were constructed along each leg and to the Branderwood subdivision.
Page 5 of 6
Attachment B
C o u n t y o f R o a n o k e , V i r g i n i a
Description of Funding Sources:
If a project contains Roanoke County funding or a match provided by the County, it is shown in the first row of funding sources and reflected in Italics.
6 FLAP: Federal Lands Access Program, supplements State and local resources for public roads, transit systems, and other transportation facilities, with an emphasis on high-
use recreation sites and economic generators.
3 Surface Transportation Block Grant (STBG) previously named Regional Surface Transportation Program (RSTP ): 100% funding awarded through the Roanoke Valley
Transportation Planning Organization; applications due September 2025 Carbon Reduction Funding (CRF): 100% funding awarded through the Roanoke Valley
Transportation Planning Organization; applications due with STBG applications.
1Revenue Sharing: 50/50 County/VDOT funding; call for applications in odd years; next due date October 1, 2025.
2 Transportation Alternatives (TE/TAP): 80/20 VDOT/County funding; call for applications in odd years; next due date October 1, 2025 for FY 2027/2028 .
4 SMART SCALE previously named House Bill 2 (HB2): 100% funding awarded through the Commonwealth Transportation Board; call for applications in even years;
pre-application window opened March 2024 with final applications due August 2024 with awards June 2025 for funding at least five years out.
5 Secondary Six-Year Program (SSYP): 100% VDOT funding to improve secondary routes (number 600 and higher); Telefees and District Grant funds (for unpaved
roads) available annually; Board of Supervisors adoption required prior to June 30 every year.
Page 6 of 6
Attachment B