HomeMy WebLinkAbout1/24/2005 - Special
71
January 24, 2005
Roanoke County Administration Center
5204 Bernard Drive
Roanoke, Virginia 24018
January 24, 2005
The Board of Supervisors of Roanoke County, Virginia, met this day at the
Roanoke County School Administration Office, 5937 Cove Road, N.W., Roanoke,
Virginia, this being an adjourned meeting from January 11, 2005, for the purpose of a
joint work session with the School Board to discuss joint funding of the County and
Schools Capital Improvement Program (CIP).
IN RE: CALL TO ORDER
Chairman Drew Barrineau called the meeting to order for the School
Board at 5:30 p.m.
MEMBERS PRESENT:
Chairman Drew Barrineau, Vice-Chairman Michael W.
Stovall, Jerry L. Canada, William A. Irvin, III, Marion G.
Roark
MEMBERS ABSENT:
None
STAFF PRESENT:
Dr. Linda Weber, Superintendent; Tom Hall, Assistant
Superintendent of Personnel; Dr. Lorraine Lange, Assistant
Superintendent of Instruction; Allen Journell, Assistant
Superintendent of Administration; Penny Hodge, Director of
Budget and Finance; George Assaid, Construction Projects
Coordinator; Chris Lowe, Construction Projects Coordinator;
Dr. Martin Misicko, Associate Director of Operations and
Transportation; Brenda Chastain, Clerk; Darlene Ratliff,
Deputy Clerk
Chairman Michael Altizer called the meeting to order for the Board of
Supervisors at 5:31 p.m. The roll call was taken.
72
January 24, 2005
MEMBERS PRESENT:
Chairman Michael W. Altizer, Vice-Chairman Michael A.
Wray, Supervisors Joseph B. “Butch” Church, Richard C.
Flora,
MEMBERS ABSENT:
Supervisor Joseph P. McNamara
STAFF PRESENT:
Elmer Hodge, County Administrator; Diane Hyatt, Chief
Financial Officer; Brent Robertson, Director of Management
and Budget; John Chambliss, Assistant County
Administrator; Dan O’Donnell, Assistant County
Administrator; Pete Haislip, Director of Parks, Recreation,
and Tourism; Mark Courtright, Assistant Director of Parks;
Paul Mahoney, County Attorney; Mary Brandt, Acting Clerk
to the Board
OTHERS PRESENT:
Shawna Morrison, Roanoke Times; Gene Marrano, Cave
Spring Connection
IN RE: FUNDING OF THE COUNTY AND SCHOOLS CAPITAL IMPROVEMENT
PROGRAM (CIP)
Ms. Hyatt reported that based on the discussion during the last joint
meeting, a combined annual contribution of $600,000 was the preferred funding
scenario. This scenario would allow both the Schools and County to begin design work
in fiscal year (FY) 05-06 followed by four years of construction for the Schools and two
years of construction for the County.
Ms. Hyatt reviewed the project timeline this funding plan would allow over
the next decade. Beginning in FY 05-06 the Schools would have $10 million to begin
designing their first capital project. In FY 06-07 $10 million would be available to begin
construction as well as a further $10 million for the design of an additional project. This
73
January 24, 2005
schedule would continue through FY 08-09. In FY 09-10 there would be new
construction and in FY 10-11 new design work. In FY 11-12 new design work and new
construction would again be possible with the last of the new construction beginning in
FY 12-13.
Ms. Hyatt reported that the County would have $20 million in FY 05-06 for
the design of its first capital project which will be the new jail facility scheduled to begin
construction in FY 06-07. An additional $10 million will be available in FY 06-07 for the
design of another project that will begin construction in FY 07-08. In FY 09-10 and FY
12-13 there will be additional new design work. The next construction phase for the
County will be FY 10-11.
Ms. Hyatt noted that this scenario would work with other contribution
amounts. For example, with an annual contribution of $400,000, there would be $6.5
million available for construction each year; with $500,000, there would be $8 million
available each year; and with $700,000, there would be $11 million available.
Ms. Hyatt advised that the Schools and the County are still in the process
of finalizing their respective Capital Improvement Programs and actual projects will be
identified later. Ms. Hyatt asked if there were any questions.
Mr. Barrineau stated that $600,000 was a good amount to start with
because of the number of needs that have been identified.
Mr. Canada added that he believed $300,000 was as much as the
Schools could realistically contribute on an annual basis. He hoped that the increased
74
January 24, 2005
enrollment budget will help the Schools meet their obligation. He noted that this doesn’t
do as much in the short term as he had hoped, but the long-term benefits are
significant.
Mr. Irvin suggested that the program be reviewed annually and the
possibility of additional contributions in future years be considered.
Ms. Hyatt noted that the contributions were incremental. Although only
$600,000 would be contributed the first year, the contribution would be $1,200,000 the
second year, $1,800,000 the third year and so on for the 10 years of the plan.
Supervisor Flora stated that he believed that the number of projects begun
under this funding plan was the maximum number of projects either side could handle at
one time.
Supervisor Altizer commended the level of cooperation between the
Schools and the County that led to the development of the funding plan.
Supervisor Church requested that contingency planning be considered to
enable the funding plan to stay on track.
Ms. Hyatt reported that she and Ms. Hodge had put together a rough draft
of budget projections identifying projected sources and uses of new revenues for the
2005-2006 fiscal year. She advised that the County is anticipating approximately $5.8
million in new revenues and Schools are projecting approximately $3.3 million in new
revenues.
75
January 24, 2005
Ms. Hodge reviewed projected personnel costs. She noted that the
Schools will have an increase in VRS rates from 11.58 percent to 12.17 percent
although the County rate will remain at 13.55 percent.
Supervisor Wray inquired if the Schools VRS rate would be capped at
12.17 percent. Ms. Hodge responded that there was a good chance VRS rates would
be revisited by the General Assembly. Ms. Hodge stated that health insurance is
projected to increase 10 percent which is below the national average. She added that
there will also be an increase in funding for the state-mandated CPMT program.
Supervisor Wray asked how the CPMT program was funded. Mr.
Chambliss responded that the cost of the program was divided between the State and
the County with the State’s share being approximately 54 percent and the County’s
share being approximately 46 percent.
There was general discussion of the tentative budget estimates.
Supervisor Flora noted that salaries for school personnel need to be addressed in the
future.
Supervisor Altizer reported that Supervisor McNamara had asked him to
inform those present that although he was unable to attend tonight’s meeting, he
supported the new funding plan. Supervisor Altizer asked if anyone had any questions.
It was agreed that a consensus had been reached.
76
January 24, 2005
IN RE: PUBLIC SAFETY BUILDING
Supervisor Flora reported that County staff and the public safety building
project architects presented information regarding the project to school personnel on
Friday, January 18, 2005. He advised that there will be a berm at the back of the
building to make the building more attractive to its neighbors and landscaping has been
added. The detention pond has been moved to improve the appearance of the site, and
the new location will allow it to provide stormwater management for the replacement
warehouse site so that a second detention pond will not be necessary. He noted that
this will result in a significant cost savings.
Supervisor Flora reported that the cost estimates for the replacement of
the School’s warehouse are higher than anticipated. The cost is now estimated at
approximately $630,000 with site developments such as paving, stormwater
management, and utilities costing an additional $70,000. Supervisor Flora added that if
it becomes necessary to install a sprinkler system, it will increase the cost an additional
$30,000. The Western Virginia Water Authority (WVWA) may require a larger vault
which will add approximately $20,000. It was agreed that the WVWA should be
contacted to determine the most economical way to implement the necessary fire
control measures. Supervisor Flora concluded that the final cost of the warehouse
could be as much as $800,000.
77
January 24, 2005
Supervisor Flora proposed that the County and Schools split the additional
costs over the original $500,000 estimate. He added that the building is out for design
now and construction could start early this summer. It was agreed that the County and
Schools would split the final cost of the warehouse above the initial $500,000 estimate.
Mr. Canada inquired if the old public safety building would be turned over
to the Schools as is or would it be renovated first. Supervisor Altizer responded that it
had been agreed that the Schools would receive the old public safety building and the
County would receive the career center. He advised that he did not believe that the old
public safety building would be renovated prior to its return to the Schools, but that it
was something that could be revisited in the future.
Mr. Canada asked if the County was still interested in the career center.
Mr. Hodge responded affirmatively, but added that County staff would have to review
current needs to be sure there was a valid use for the building. This will ensure a
smooth transition so the building will not be left empty.
Mr. Hodge stated that he would like to get the site subdivision worked out
quickly so that progress on the project can continue. Mr. Barrineau noted that it was on
the agenda for Wednesday, January 26, and the School Board would take action on it
February 9. Mr. O’Donnell added that the County could take action on February 8
contingent on the school’s approval.
78
January 24, 2005
IN RE: UPDATE ON MIDDLE SCHOOL SOFTBALL AND BASEBALL
Mr. Haislip reported that he had participated in a work session with the
Board of Supervisors several weeks ago to review the status of the middle school
baseball and softball programs. The main issue concerns the understanding in place
for the last few years that when new sports programs are adopted, the necessary
resources and facilities would also be allocated.
Mr. Haislip reviewed the new practice schedule for the junior varsity,
varsity, and middle school programs at Parks and Recreation sites and school sites that
have been built and are maintained by Parks and Recreation. Mr. Haislip noted there
are 20 fields used by the schools that are maintained by Parks and Recreation. He
advised that he had met with the school athletic directors to ascertain their needs, and
each team will have a field for practice although not all the fields will be regulation. He
noted that the Glenvar teams are practicing on a short field and the Cave Spring Middle
School teams will be using an adult female softball field at Arnold R. Burton.
Mr. Haislip advised that the schedule for games has not been finalized
and they will work with the high schools to gain access to their fields for games. He
added that Waldron Park and Goode Park will be opened for games. He concluded that
where space exists, it will be provided.
Mr. Haislip reported that due to the increased use of Parks and Recreation
fields, there will be increased costs for field maintenance which Parks and Recreation
79
January 24, 2005
does not have in its budget. He advised that it will be necessary to increase dragging
the fields from 2 times a week to 4 or 5 times a week and additional infield soil will be
required as well. Mr. Haislip added that there is no staff support for this additional
maintenance. He advised that job boxes with rakes and drags have been provided at
some fields so the school teams can assist with field maintenance. He suggested
additional job boxes and equipment be purchased to increase school participation.
Mr. Haislip requested the School Board provide direction to the athletic staff regarding
their assistance with field maintenance.
Supervisor Church stated that this type of field maintenance is an
important safety issue and suggested that safety be an important part of the
presentation to the athletic staff.
Mr. Haislip reviewed the preliminary budget for the additional field
maintenance required by the new middle school programs. He reported that it will cost
approximately $25,000 annually for the extra dragging, additional infield soil, and two
additional part-time staff. Start up costs will be approximately $12,000 which includes
an additional drag and a trailer. He noted that there will be no cost for the additional
pick up truck required since that will come from surplus. Mr. Haislip added that if Parks
and Recreation had to buy infield soil on the open market, it would cost approximately
$50,000 - 60,000; however, Parks and Recreation makes the soil it uses on Bent
Mountain.
80
January 24, 2005
Mr. Stovall requested that Mr. Haislip submit a maintenance budget to the
Schools. Mr. Haislip agreed to do so.
Mr. Hodge inquired if the fields were being over used for safety.
Mr. Haislip responded that safety was an issue and that the schools need to ensure
their teams do the necessary dragging after practice. He added that the additional
dragging and additional soils are essential to safety with the heavy use some of these
fields will receive.
IN RE:
ADJOURNMENT
Chairman Barrineau declared a brief recess at 6:44 p. m. to allow the
Roanoke County Board of Supervisors to adjourn.
Chairman Altizer adjourned the Roanoke County Board of Supervisors
meeting at 6:45 p.m. until the January 25, 2005, Board meeting at 3:00 p.m.
Submitted by:
Approved by:
randt
lerk to the Board
~#.~
Michael W. Altizer
Chairman