October 20, 2026
Commissioners Present:
Troy Henderson, Chairma
Mr. Rick James, Vice-Chairm
Mr. Wayne Bower
Mr. Jim Woltz
Mr. Chris Newton
Staff Present:
Mr. Philip Thompson, Secretary
Ms. Megan Cronise, Assistant Director of Planning
Ms. Rachel Lower, Acting County Attorney
Ms. Marion Pickering, Recording Secretary
Ms. Summer Bork, Transportation Planner
Mr. Nathan Grim, Transportation Planner
Mr. Ross Hammes, Long Range Planner
Call to Order
Mr. Henderson called the meeting to order at 6:04 p.1
Approval of Agenda
Mr. Woltz made a motion to approve the agenda, which passed 5-0.
Discussion of Transportation ProjtSfta
Kis. Cronise, Mr. Grim, and Ms. Bork presented. Ms. Cronise began with an overview of
funded Surface Transportation Block Grant (STBG) applications and Carbon Reduction
Pro ram CRP) a0lications, noting winq ap lications have bee that as of 2026, the folio
Ms. Bork reported on funding secured for a Railroad Crossing Elimination Study at tj
Layman Road crossing and Glade Creek Road crossing, noting that $555,000 had be
awarded for the study.
Ms. Cronise moved on to review the statewide transportation funding program, SMAR
'I
SCALE. Mr. James advised that rural areas have stiff competition for this funding and
is remarkable that Ms. Croniser and her team have been able to secure as much fundi
.?rs they have.
;; ;iIiiiiiii; lll1;-lll1;1 mimm
i��
ROANOKE COUNTY PLANNING COMMISSION MINUTES October 20, 2026
Route 419 Phase 3: Route 419 Multimodal Safety Improvements, Phase 3 Proje
Pipeline Round 3 Study. Ms. Cronise advised that Roanoke County has applied for $5.
million for traffic improvement measures at Route 419 and Colonial Avenue; $4.8 milli
to reconfigure an intersection and add pedestrian signals and cross walks on Route 41
at Chaparral Drive; $13.6 million to improve intersections and extend sidewalk and bicycl
lanes at Route 419 between Starkey Road and Colonial Avenue. I
Peters Creek Road/Williamson Road Project Pipeline Round 2 Study Corridor
(Woodhaven to Plantation): Ms. Cronise advised that Roanoke County has applied for:
$11.9 million for improvements to turn lanes, pedestrian signals, intersections, and
medians to Peters Creek Road at Airport Road/Archcrest Drive; $11.4 million for
improvements to Peters Creek Road at Barrens Road including pedestrian signals,
crosswalks, and sidewalks; $32 mon for improvements to Peters Creek Road at
Williamson Road including a roundabout, pedestrian crosswalks, and new sidewalk; Ms.
Cronise noted a total of $49.4 million has been requested for the entire study corridor to
address all mid-term recommendations on Peters Creek Road/Williamson Road from
Woodhaven Road to Plantation Road including intersection improvements at Airport
Road/Archcrest Drive, Barrens Road, and the construction of a roundabout at Peters
Creek Road and Williamson Road,
Mr. Grim presented on the Plantation Road (Hershberger Road to Hollins Road) Virgin
Walkability Action Institute Study, noting Roanoke County's application for $5.1 million
make improvements to the VWAI study area including upgraded sidewalk and pedestri
crosswalks, upgrades to existing transit stops, and reconstruction of the intersection
the Food Lion[Walmart Neighborhood Market to reduce crashes, I
Ms. Cronise presented a summary of all SMART SCALE Round 7 Submitted Applicati
Estimates, noting that in total the County has requested $133,579,083 in funding. S
advised the Commission on next steps for Round 7, noting that in January of 2027 t
recommended funding scenario would be released, with Six -Year Plan Adoption by t
Commonwealth Transportation Board anticipated in June of 2027. 1
Ms. Cronise presented on completed transportation projects including: Wiliamson Ro
pedestrian improvements at North Roanoke Assisted Living to Plymouth Drive ($3.
million for extended sidewalk from the Highway Safety Improvement Program); t
Orange Market Park and Ride improvements ($1.8 million from STBG/CRP to pave a
restripe the parking lot and add pedestrian connections and site amenities); Glade Cre
Greenway through Vinyard Park West ($960,000 from the Transportation Alternativ],
Program to complete a mile long greenway through the park connecting both parkin
�.ots); East Roanoke River Greenway Explore Park to Rutrough Point ($4.8 million frori
QTBG/CRP to complete a 1.4 mite greenway through the park). M
10-grMI&I
ROANOKE COUNTY PLANNING COMMISSION MINUTES October 20, 2026
and old ramp removal are taking place; Route 419/Route 220 Diverging Diamond
Interchange ($17,500,000 from STBG and SMART SCALE for bicycle lanes, sidewalk
connections, and the diverging diamond interchange itself), noting the project is
anticipated to reach completion in 2028, Route 220 Signalization Improvements ($10.2
million from an Interstate 73 Earmark to improve traffic flow at four City/County
intersections with through -cut configurations to eliminate traffic crossing Route 220 and
pedestrian safety improvements), noting completion is anticipated in 2028; Dry Hollow
Road safety improvements ($7.4 million from the Secondary Six -Year Program, and
Revenue Sharing for stabzing the road against the creek, and a concrete barrier to
create one 17 foot wide travel lane with traffic signals on both approaches), noting a
completion date of Fall 2027; Route 460/Challenger Avenue Improvements ($41.6 million
from STBG and SMART SCALE for improvements to pedestrian safety and traffic flow),
noting that construction is expected to begin October 2026.
Ms. Cronise then reviewed projects anticipated to come under construction in 2027: T
Valleypointe Parkway Realignment ($9.8 million from STBG and SMART SCALE
realign and widen Valley Pointe Parkway from Concourse Drive to Woodhaven Road wi
sidewalk and crosswalks), scheduled to begin November of 2026; Route 419 Streetsca
Improvements, Phase 2 Ogden Road to Starkey Road ($28 million from STBG a
SMART SCALE for road widening, bicycle lanes, sidewalks, and intersecti
improvements) anticipated to come under construction in 2027; Route 419/Electric Ro
Safety Improvements, Stoneybrook Drive to Grandin Road Extension ($6.6 million fro
SMART SCALE to improve traffic flow and pedestrian safety) anticipated to s a
construction in 2027: Route 419 Pedestrian Crossing Improvements, Brambleton Aven
and Postal at mon from SMART SCALE for signalized pedestrian crosswalk
anticipated to start construction in 2027 Route 11/460 at Dow Hollow Road ($1.7 milli
from STBG for intersection improvements including a traffic signal at Dow Hollow Ro
and West Main Street, and at Dow Hollow and Fallbrooke Drive for controlling deto
route traffic) anticipated to start construction in Spring of 2027 when interstate widenino
begins.
Ms. Cronise then advised the Commission on the Washington Avenue Multimodl�
Corridor Study, stating a tht the goal of the studoy is tgenerate one or more SMAR
SCALE Round 8 applications. The study area includes Washington Avenue fro
Dogwood Boulevard to the Blue Ridge Parkway. Ms. Cronise advised that two surve'