HomeMy WebLinkAbout4/21/2015 - RegularMINUTES OF A REGULAR MEETING OF VINTON TOWN COUNCIL HELD AT 6:00 P,
ON TUESDAY, APRIL 21, 2015, IN THE COUNCIL CHAMBERS OF THE VINTO
MUNICIPAL BUILDING LOCATED AT 311 SOUTH POLLARD STREET, VINTO
VIRGINIA I
MEMBERS PRESENT: Bradley E. Grose, Mayor
Matthew S. Hare, Vice Mayor
William W. Nance
Sabrina M. Weeks
MEMBER ABSENT: 1. Douglas Adams, Jr.
STAFF PRESENT: Christopher S. Lawrence, Town Manager
Theresa Fontana, Town Attorney
Ryan Spitzer, Assistant Town Manager
Ben Cook, Police Chief
Anita McMillan, Planning & Zoning Director
Mary Beth Layman, Special Programs Director
Donna Collins, Human Resources Specialist
Gary Woodson, Public Works Director
Joey Hiner, Public Works Assistant Director
The Mayor called the work session to order at 6:00
p.m. for an update on the skate park location options,
The Town Manager began by commenting that we have
had a lot of community conversations over the skate park
proposal and had a number of sites selected for
evaluation. A public meeting was held at the War
Memorial to receive comments on several sites and after
the meeting Council gave direction to staff to narrow it
down to two sites. The two sites selected are the
Jackson Street site and a five -acre parcel on Walnut
Avenue just pass the new bridge. Mr. Spitzer will present
the factors for both sites and the costs and we are looking
for direction from Council as to which site is preferred and
at what level of participation,
Mr. Spitzer began his power point presentation by
commenting that on November 18 th , .a Memorandum
of Understanding between the Town and Invoke
Ministries was presented to Council for the creation of a
skate park behind the Municipal Building. Council
directed staff during that meeting to look at other sites
and the factors that would go into running a skate park.
On December I", a community meeting was held in
Council Chambers with members from both the skate and
church communities with regard to the proposed site
behind the Municipal Building. At that time we were also
presented with a list of an additional 12 sites around
Town that citizens thought would be more beneficial for a
skate park than the proposed site, The site behind the
Municipal Building was proposed because the signage
was already there, it would be an easy up fit for the skate
park and the Town is required to do something with that
site as part of the CDBG Grant,
Staff reviewed all of the proposed sites and narrowed
those down to four that would be feasible and realistic for
a skate park. The four sites were on Jackson Street,
Walnut Avenue, 3rd Street, which is the old landfill, and a
piece of private property behind Washington Avenue. On
January 29t', a more formal community meeting was held
at the War Memorial on these four sites and from the
comments received, two sites was favored, the Jackson
Street and Walnut Avenue site.
Alternative No. 2 is the Jackson Street site, which already
has two concrete slabs and parking, but is in a dense
urban area with churches and other businesses as
neighbors, The project site draft shows repair to the
existing concrete slabs with some type of sports turf
placed on the site, Some fencing would be placed
around the edges so keep the skate boards in the p.rk,
There would be two surfaces —a concrete and more of a
street type of surface with six parking spaces dedicated
for firefighters. We would up fit the gravel parking lot that
is now next to Reed Street Baptist Church, but keep their
existing handicapped parking. Also a fence will be
placed along the area of the current retaining wall. The
estimated cost for this site is $20,000 with the majority of
this cost being for materials for the sports turf, to rehab
the concrete slabs and the fencing. The skate board
ramps will be provided by Invoke Ministries.
Mr. Spitzer next commented that Alternative Site 1 is the
five -acre site on Walnut Avenue. This is the site where
the construction equipment was housed during the
construction of the Walnut Avenue bridge, The site plan
shows multiple uses for recreation. There would be a
10,000 square feet concrete pad for the skate park, which
is approximately 4,000 more square feet that the Jackson
Street site.
The parking lot would be gravel in the beginning, but as
the greenway is added, that parking lot will be
blacktopped and paid for with Greenway funds. This site
has an expansion area to the left of the concrete pad
(facing Walnut Avenue) for possibly a basketball court
and the potential for a BMX track in the back of the
property. The estimated cost to do the basketball court,
the 10,000 square foot concrete slab, a pavilion with a
metal roof, parking area, an entrance sign and walking
paths is 'sip pi The concrete slab for the skate park
could be constructed first and perhaps, as other funds
Wecome available, another section can be completed,
Because more than 10,000 square feet would be
disturbed with this site, we would have to do E & S and
have an engineer design the site because of regulations.
Ms. Spitzer commented that when we hired an engineer,
FA
to do the site drawings for the sidewalks along Walnut
Avenue, the cost was approximately $9,000. This site is
away from everybody, but still in a highly visible area.
There are AEP poles that could have lights added. There
is a convenience store nearby and sidewalks will go all
the watj to the site once the next *,hase of Walnut Avenue -
is completed.
There is currently no use for this property due to the
rocky terrain in the rear of the lot and the front being so
limited in space as well as being in a floodplain. The
with federal funds, so if we were to ever sell it, the
Federal Government would have to be reimbursed, Also,
Invoke Ministries sees great potential in the site because
of its location and the ability to do programming at the site
that will not interfere with residences.
0
BITU track would be unique as well. He then asked if
Council gives their consensus, could staff move ahead
with making plans or pursuing grants to help pay for
some of the initial expenses,
Council Member Weeks commented on the discussions
that were had last year about a pocket park to be located
next to the Municipal Building. However, it is her
understanding that even if the Lions Club was able to j
secure some funds, there would •- some stormwater
maintenance that would need to be done on the site prior
to the building of the park. With that said, Ms. Weeks
next commented that perhaps the Lions Club, if
interested in moving forward, would •• interested in using
those funds toward the skate park. Also, there is a form
provided by Invoke Ministries where individuals can make
donations and specify them to go toward the Vinton skate
board park.
Council Member Nance next commented that he agreed
the Jackson Street site should be eliminated from
consideration any further. The skate park needs to be a
good neighbor and even though Mr. Coy and his ministry
did everything they could to build that bridge, there never
was a chance for the opportunity to relieve people's
concerns about that location. He felt that this site should
be rehabbed with all appropriate speed as soon as the
next fiscal year begins.
The Walnut Avenue site has more possibilities and he
<►# the fact that everyone is enthusiastic at about
this site. However, since this is the first time this site has
been considered as a potential site, he thinks the
enthusiasm should be curbed until we are sure that the
site meets the test of the citizens and surrounding
neighbors.
Mr. Nance further commented that he would be
supportive of using this Town -owned property and for the
Town to provide ♦' in -kind services if there are ways
to help defray some costs. As part of our proposed
budget, there is a recommendation before us to eliminate
the K9 unit and to close the swimming pool that has
served this community for over six decades, It would be
very hard for him to close a public gathering space and
then spend even more money to create a brand-new
space. Invoke Ministries has its heart in the right place
and there is excitement of staff and Council to have this
park, but he cannot cut in some areas to save money and
then spend even more on something new and shiny.
The Mayor next commented that Council has expressed
their support for the Walnut Avenue •
but they want to
make sure that it is the right location. Two things we
0
learned from our prior skate park is that it must be highly
visible and has to have much more involvement and
some supervision. He then asked Dan Coy to make
comments regarding this site.
Mr. Coy commented that he has enjoyed talking with the
community, the churches and the business owners, but
from his perspective, they are not in a rush as long as
there is momentum and movement. The plan is to have
at least two nights of programming provided by Invoke at
a minimum with probably a presence daily from the
leaders. There are a lot of good things that could
happen on this site and they are committed to making this
place a safe and creative environment, He has more
equipment now than he has ever had to make this a great
top-notch draw for the community that is not just going to
serve the people here, but from outside the community.
Sam Dean, a business owner and resident of Vinton,
commented that his son is a skater, The kids that are
skaters are good kids and it is a group that needs to be
reached out to. He is a photographer and works with
the Roanoke Valley Convention and Tourism Bureau for
the County and is very aware of how people perceive the
Roanoke Valley and especially this community, We need
to get people to think about Vinton as a place that is
progressing and where things are happening and this is a
huge step in the right direction. He thanked Council for
even entertaining the possibility of creating a skate park.
Greg Allen commented that he understood the hesitation
based on the problems with the other skate parks.
However, Dan Coy and Invoke Ministries has meant a lot
to him and his friends and he feels like the skate park
would do a lot of good for the kids around the community.
The Mayor commented in closing that Council sees the
need for the skate park, but they will have to have
partners in this project. The Town Manager commented
that clear direction has been given on which site to
consider and we need to improve on the current drafted
design plan. We need to have another neighborhood
meeting and pull the bigger community, specifically our
Cleveland, Cedar and Walnut neighborhoods with some
concrete ideas so we will have more support. After that
staff will come back to Council with a concept plan in
phases along with some information regarding funding
and available grants and ultimately will need permission
to proceed on whatever Phase
"r 77 717177 i M774YOTU=7 NFT—file re!61-Tiar Ineeting to oFWe7-M--i -
p.m. Donna Collins, Human Resources Specialist cafle
the roll with Council Member Nance, Council Memb
Weeks, Vice Mayor Hare and Mayor Grose presen]
[Z-93F.-M
69
Council Member Adams was absent. After a Moment of
Silence, Council Member Weeks led the Pledge of
Allegiance to the U.S. Flag.
Under upcoming community events/ announcements,
Council Member Weeks announced the Dogwood
Festival that starts tomorrow and goes through Sunday.
The Town Manager commented that even though the
downtown area is under construction, the parade on
Saturday will still to down Washington, Maple and loop
around Pollard Street and back.
Council Member Nance made a motion to approve the
Consent Agenda as presented; the motion was seconded
by Vice Mayor Hare and carried by the following vote, with
all members voting: Vote 4-0; Yeas (4) — Nance, Weeks,
Hare, Grose; Nays (0) — None; Absent (1) - Adams.
Under awards, recognitions and presentations, the
first item was a Proclamation for National Drinking Water
Week. Council Member Nance read the Proclamation
and presented it to Gary Woodson, Public Works
Director,
The next item on the agenda was to consider public
comments regarding amendments to Article 11. Districts
and District Map, Sec. 2-1. Establishment of zoning
districts, by adding Mixed Use Development (MUD)
District; Article IV. District Regulations, by adopting and
enacting Division 14. Mixed Use Development (MUD)
District; Amending Article X. Definitions, Section 10-2.
Words and Terms Defined (b) Certain Words and Terms
Defined, by amending and enacting certain words and
terms defined, of Appendix B, Zoning, of the Town Code.
The Mayor opened the Public Hearing at 7:17 p.m.
Anita McMillan commented on her staff report regarding
the amendment to the Zoning Ordinance to add Mixed
Use Development (MUD) District and amending
definitions. Staff began working on the MUD District
because of the potential redevelopment of the former
Roland E. Cook and William Byrd High school buildings.
Additionally, there are several parcels in the Town that
are under-utilized such as the River Park Shopping
Center, Currently the Town's zoning districts are very
traditional and do not allow for mixed -use development.
The Planning Commission had work sessions in
November and Janualmy and Txwn
December on the proposed MUD District. A joint work
session with the Planning Commission and Council was
had in February. Due to the weather, the Planning
Commission had to reschedule their Public Hearing from
March to April. This Public Hearing was held on April 2 Id
Approved minutes for the Special
Council meeting of March 31,
2015
and the Planning Commission voted unanimously to
recommend that Council consider adoption of the
proposed amendment to the Zoning Ordinance. Staff did
not receive any comments from the public with regard to
the proposed amendment,
One provision in the original proposed amendment
provided that if a piece of property went through the
rezoning process and it was not developed after two
Public Hearing closed
years it would revert back to the original zoning. Based
on discussion with our Town Attorney, this language was
Adopted Ordinance No. 960
removed from the final proposed Ordinance. For a piece
amending the Zoning Ordinance
of property to go through the rezoning process, the
to add Mixed Use Development
petitioner would have to submit a master plan and the
(MUD) District and amending
development of some properties make take more than
definitions. Staff began working
two years. Also, the thought was that if a developer
on the MUD District because of
spends money for a master plan, most likely they will go
the potential redevelopment of the
through with the development.
former Roland E. Cook and
William Byrd High school
Hearing no comments, the Public Hearing was closed at
buildings. Additionally, there are
7:22 p.m.
several parcels in the Town that
are under-utilized such as the
Vice Mayor Hare made a motion to adopt the Ordinance
River Park Shopping Center.
as presented; the motion was seconded by Council
Currently the Town's zoning
Member Nance carried by the following roll call vote, with
districts are very traditional and do
all members voting: Vote 4-0; Yeas (4) — Nance, Weeks,
not allow for mixed -use
Hare, Grose; Nays (0) — None; Absent (1) - Adams.
development
The next item on the agenda was to consider
adoption of a Resolution approving the 2015-2016
operating budget of the Roanoke Valley Resource
Authority. Dan Miles, Chief Executive Officer, began by
commenting that the proposed budget totals $8,525,174.
This is a balanced budget with revenues equaling the
projected expenditures. In order to balance the budget,
they are using $434,974 from the contingency fund,
which has been done for the past several years. The
budget represents a $22,971 increase from the current
fiscal year or a 0.3% increase.
There is a $1.00 per ton increase in the Municipal tipping
fee from $48.00 per ton to $49.00 per ton. That increase
for the region represents about a $0.10 per household
per month increase. Vinton's per capita tonnage
generation is a little less than the rest of the region, so for
Vinton this represents about a $0.08 per household per
month increase,
Mr. Miles next commented regarding the closing of the
Town's Td Street dumpsters. Last year when he
presented the budget to Council, he informed them that
the Resource Authority would be constructing a new
residential service area. They are still in that process, but
after being delayed in obtaining the stormwater permit,
0
they first went out for bids two months ago and only
received one bid which was substantially more than I
budgeted for the project. They decided to take the
specifications and divide them into two different
components, send them back out and allow more time for
other contractors to look at the materials. They received
those bids today which are much more in line with the
anticipated cost, The matter will be presented to the
Board of Directors at their next meeting and he believes
they will approve moving forward with the project. It will
take approximately three months to complete and they
anticipate that the area will be up and running by
Fall.
Vice Mayor Hare referred to the second page of the
Summary of the budget and the fact that the Authority
has transferred funds from the contingency reserve fund
for the past five years. Mr. Hare commented that in the
real world, you eventually run out of contingency,
However, the Authority never seems to run out and would
it be incorrect to say it is because they no longer have
debt service. He knows they set aside funds for
equipment purchases rather than taking out more debt.
Mr. Miles responded that the contingency fund right now
has $1.2 million and if they were to continuously draw
$400,000 out, after three years it would be anticipated
that the reserve fund would be gone. The $450,000 that
it being transferred to balance the proposed budget is
roughly equivalent to about $3.00 per ton on the tipping
fee based on about 150,000 tons a year. In order to
balance the budget they use that amount from the
contingency reserve anticipating that the expenditures will
likely not be completely what has been budgeted. They
try to overestimate their expenditures and under estimate
their revenues in order to have a built-in cushion.
For the past few years they have had a surplus fund
balance at the end of the year. The Board looks at the
surplus fund balance and decides what they want to do
with those funds. For the past few years, they have taken
that surplus fund balance and put it back into the
contingency fund. If the budget were to work out exactly,
then about three years out, they would be looking at an
increase of that $3.00 per ton increase they have
buffering using the contingency money. They have been
balancing the use of the contingency fund with some
small increases in the tipping fees so that it is not that big
of a hit on the municipal and commercial customers in
order to try to get them where they are not relying on the
use of that contingency fund as much as they have been
in the past.
PIP
Mr. Miles further commented that they are starting to see
some changes in the economy because garbage is an
economic indicator. If less garbage comes through the
gates, they get less revenue. The municipal waste has
been very stagnant for a number of years and the general
population is not feeling the economy resurging at this
point in time. The good news is that the commercial side
is picking up and with this proposed budget, they are
projecting some increase in revenues from the
commercial sector. They are trying to keep the rates as
low as possible, but still operate in an economically
feasible manner and provide an environmentally sound
method of disposal.
Council Member Nance made a motion to adopt the
Resolution as presented; the motion was seconded by Adopted Resolution No. 2104
Vice Mayor Hare and carried by the following roll call approving the 2015-2016
vote, with all members voting: Vote 4-0; Yeas (4) — operating budget of the Roanoke
Nance, Weeks, Hare, Grose; Nays (0) — None; Absent (1) Valley Resource Authority
- Adams.
The next item on the agenda was an update and
consideration of approval to publish an RFP for
renovations to the Farmers' Market as part of the
$700,000 CIDBG Project. Ryan Spitzer began with a
Power Point presentation showing photos of the current
Farmers' Market site, The previous site plan that was
presented to Council in November was more aesthetic
than functional with the angled seat walls to go with the
angle of the stage to the Market along with some striping
and some bollards. The focus was not on the stage
because the grant submittal to the DHCD only included
the actual site of the Farmer's Market parking lot.
The original thought was to try and create a connected
space between the stage and the Market area where
people would feel that it was all one space, The idea was
to create a greener space, get rid of a lot of the pavement
,.-.,nd to do a site redesign. The budget that was presente-4
24 that time was $112,084.
After briefing Council, the direction given was more
emphasis on the stage, more utilitarian, for the space to
be functional and for people to be able to use the space.
The money needed to be put toward the best possible
use for the Town, for the venue and the citizens. There
was concern on the placement of the trees and a
connection of the stage to the Market area. This new
concept had to be approved by DHCD because the
original application was designed for the Farmers' Market
.q.nd not for the stage and DHCD did not see the —
connection between the two.
M