HomeMy WebLinkAbout9/2/2014 - RegularMINUTES OF A REGULAR MEETING OF VINTONOUNCIL TOWN COUNCIL HELD AT 6:30 P.M,
ON TUESDAY, SEPTEMBER 2, 2014, IN THE CCHAMBERS OF THE VINTON
MUNICIPAL BUILDING LOCATED AT 311 SOUTH POLLARD STREET, VINTON,
VIRGINIA.
MEMBERS PRESENT: Bradley E. Grose, Mayor
Matthew S. Hare, Vice Mayor
1. Douglas Adams, Jr.
William W. Nance
Sabrina M. Weeks
STAFF PRESENT: Christopher S. Lawrence, Town Manager
Theresa Fontana, Town Attorney
Susan N. Johnson, Town Clerk
Ryan Spitzer, Assistant Town Manager
Gary Woodson, Public Works Director
Barry Thompson, Finance Director/Treasurer
Joey Hiner, Public Works Assistant Director
The Mayor called the work session to order at 6:00 p.m.
for a briefing on two project efforts, a conceptual Eleven
Intersection Traffic Improvements Plan and the existing
VDOT Walnut Avenue/8th Street Intersection Improvements.
Before the presentation by Mr. Woodson, the Mayor asked
for a brief history of the RSTP grant funding. The Town
Manager responded that RSTP (Regional Surface
Transportation Program) funding was first made available
last year because the Roanoke Valley's designation as an
MPO (Metropolitan Planning Organization) grew to the next
level of an urbanized area boundary population of over
200,000, Because of this, the federal government has
issued additional funds to our local MPO which then decides
how to distribute those funds through our member Roanoke
Valley organizations. We need to decide how we can best
compete for the $14 million that has been designated for our
area over the next five years. Last year we received
$100,000 for the Walnut Avenue sidewalk project.
The pedestrian bridge project that Anita McMillan briefed
Council on at the last meeting was out -year funded to 2017,
The Walnut Avenue/8h Street Intersection project was
submitted last year and the Eleven Intersection Traffic
Improvements Plan is a new project for consideration.
Gary Woodson began by showing a current aerial view of
the Walnut Avenue/8 th Street intersection. He commented
that in 2010, VDOT was asked to move forward on
preliminary engineering for this project and in March of that
year, VDOT held a pre-scoping meeting and discussed
conceptual plans and ideas on how they would move
forward with the project. Several ideas for the project
included a roundabout, a non -signalized intersection and a
signalized intersection. Based on the railroad tracks and
traffic counts, it was determined at that time that the Town
was interested in the traditional signalized intersection.
There has been no further progress on the project nor is
there a concept plan. The pre-scoping estimated budget
from VDOT to do the project is $2,334,931 which is subject
to change. The current expenditures on the project to date
-pre $5,372 and the current allocations through the RSTP for
the FY2017-FY2019 timeframe is $2,093,37Z
The Town Manager commented that when the Walnut
Avenue project was started several years ago, it was
envisioned as one project. In late 2008, VDOT indicated
there was only $3 million available and the bridge would
take all of that. Just before 2010, our former Public Works
Director suggested that we took divided the project into
three phases --the bridge, the intersection and everything
from the bridge to downtown which is primarily streetscape.
The next phase is the intersection and the only work that
has been done up to this point is a review of the geometry of
the traffic circle along with the railroad tracks and the
ownership of Southern States, Alvero's Market and Viking
Fence, There is not enough room without the taking or
purchasing of all that industrial commercial property. The
other alternatives would be a T-intersection with traffic
signalization tied into the railroad tracks or a non -signalized
intersection which is what we currently have and is not the
best option. One idea is if we submitted this as an RSTP
project, would it help to speed it up. If VDOT only allocates
small amounts of funding every year, it will take a long time
to get to $2 million and the longer we wait the cost of
construction goes up,
Vice Mayor Hare asked if staff believed this to be the mosli
dangerous intersection. Mr. Woodson responded that
was No. 2 on our list of priorities and the Walnut Avenue
bridge replacement was No. 1. When VDOT asked for us t*
identify our No. 1 priority project, this was submitted.
Mr. Woodson next briefed Council on a conceptual Eleven
Intersection Traffic Improvements Plan by first showing an
aerial view of all the Town's intersections. He commented
that we would break up the intersections into five different
phases over a five-year period, The Niagara Road and
Vinyard Road intersections with Hardy Road would be the
first order of priority. We would then continue with the PFG,
3rd Street and Pollard Street intersections with Virginia
Avenue in Year 2; Clearview Avenue and Bypass Road with
Hardy Road in Year 3; Bypass Road and Mountain View
Road with Washington Avenue in Year 4 and Pollard Street
at Washington Avenue/Gus Nicks and Lee Avenue in Year
5.
4
The entire project is projected to cost $2,750,000, but this
phasing would break it down into $500,000 per year at a
cost of $250,000 per intersection. The scope of services for
the $250,000 would be surveying, engineering, minor
pavement modifications and full signal installation upgrades
to include controller, mast arms and detectors. If we want to
qdd other items such as crosswalks or markings, that would
increase the costs.
We have been talking with a consultant whose traffic
tngineers can put together the grant application for us at a
cost of $1,500 which we hope would give us more of an
?dvantage to try and capture some of the RSTP funding. —
I11r. Adams asked about traffic data that would show the
number of accidents at each intersection and Mr. Woodson
responded that the traffic engineer would pull that data and
take it into consideration. The first course of action if we get
funds allocated for this project would be the overall design
for all eleven intersections at a preliminary cost of
approximately $77,000. At that time we would review the
traffic data and could prioritize the intersections, The Town
Manager further commented that doing certain intersections
in one year are not only based on public safety but also the
geographic locations of the intersections.
Mr. Woodson next commented that the applications go to
the RSTP Committee which scores and grades the
applications based on certain criteria and their
recommendations are then forwarded to the local MPO for
their review and final decisions on which projects get the
funding.
Mr. Nance asked if the five-year plan for the eleven
intersections would be put in as one grant or five separatd
ones. Mr. Woodson said we would put it in as one grant.
The Town Manager commented that we have to competq
each year for the next year's funding. We will ask for the
total cost, but explain that we need to design the project firs),
and then show some logical phasing.
Vice Mayor Hare said that a complaint he has heard for
many years while serving on the Greenway Commission is
that we are not a pedestrian or bike friendly community. If
we are going to do these intersections perhaps we should
do them right even if it means that we might have to
9
eliminate some • from the project. The Town
Manager commented that these preliminary figures are to
replace the entire intersections, When an engineer comes
in and reviews each intersection, it may •" that the mast
arms are fine in some and we just need to upgrade the
system. However, if Council would like for the project to
include a factor for pedestrian friendly crossings, we can do
that. The Mayor and other Council members agreed that we
need to include that for those intersections where it is
needed,
In closing the Town Manager commented that we have
three projects, the joint application with the City of Roanoke
for the Tinker Creek Pedestrian Bridge, the Walnut
Avenue/8th Street intersection and the Eleven Traffic
Improvements Intersections. Now that we have briefed
Council on all three projects, we plan to present our
recommendation of the order of the three projects to submit
for the RSTP funds at the next meeting and will need
Council's approval to proceed with the applications. Council
gave their consensus to bring the matter back at the next
Council meeting for action,
The Mayor called the regular meeting to order at 7:00 Roll call
p.m. The Town Clerk called the roll with Council Member
Adams, Council Member Nance, Council •... Weeks,
Vice Mayor Hare and Mayor Grose present. After a Moment
of Silence, Vice Mayor Hare led the Pledge of Allegiance to
the U.S. Flag.
• upcoming community •
Mr. Nance announced the next Mingle in the Market •
th
September 13 . Ms. Weeks also announced the Chamber
Golf Tournament on September 18 1h at Hidden Valley
Country Club. The Mayor mentioned that the date of the
Fall Festival will be October 11 1h and Mr. Nance reminded
everyone of the Vinton Breakfast Lions Club pancake
breakfast the morning of the Festival.
Vice Mayor are made a motion to approve the Consent
Agenda as presented; the motion was seconded by Mr.
Adams and carried by the following vote, with all members Approved minutes for the
voting- Vote 5-0; Yeas (5) — Adams, Nance, Weeks, Hare, regular Council meeting of
Grose; Nays (0). August 19, 2014
The Mayor announced that the month of September is
National Preparedness Month.
The next item • consideration was a Resolution
4wthorizing the Town Manager to execute a Lease
Agreement with Alexander Films, LLC for space in the
Health Department Building located at 227 South Pollard
Street, Vinton, Virginia. The Town Manager began by
51
commenting that staff was approached by Marc Hutchins of
Alexander Films to film several scenes for a family -friendly
movie in Vinton. During the filming, they are in need of
office space in Town and we are recommending the vacant
space on the top floor of the Health Department building for
a three-month time period from September to November.
We have worked with our Town Attorney to draft a Lease
document which was included with the agenda. Our
proposal is to charge $200 per month which will cover our
utilities and we will work with them to get telecommunication
cervices which the Lease provides they will pay for.
The Resolution provides for the Town Manager to execute
the Lease and we have three changes to make to the draft
that has been presented. After talking to the Town Attorney
and based on Mr, Hutchins' current insurance coverage of
$1 million, we are in agreement that is enough. Regarding
the language concerning worker's compensation insurance,
Mr. Hutchins has all contracted employees. However, we
are leaving the language in the Lease in the event he should
hire any of his own. Also, he has requested five keys and
we had the two doors re -keyed today and will change the
number of keys in the Lease,
Mr. Hutchins next made comments that the film they will be
producing is a romantic comedy and all of their films are
family in nature. He first made contact with Mr. Spitzer and
he was very welcoming and all the other contacts he has
made in the community have been very supportive of the
film. They will be shooting from October 12th to November
8'h, six days a week and being able to have this office space
for pre -production increases the productivity, Mr, Hutchins
further commented that there will be a need for background
extras and they have scheduled a big local casting call at
Thrasher Church.
After additional comments by Council, Mr, Adams made a
motion to adopt the Resolution as presented; the motion
was seconded by Ms. Weeks and carried by the following
roll call vote, with all members voting: Vote 5-0-1; Yeas (4)
— Adams, Nance, Weeks, Grose; Nays (0); Abstain
Hare. Vice Mayor Hare indicated that he abstained from
voting due to the fact that his niece is a contractor for
Alexander Films, but he is fully supportive of the film.
Under update on old business, the Mayor asked about
the amendment to the animal ordinance. The Town
Manager responded that he has been discussing with staff
the process to enforce the proposed changes to the
ordinance. The proposed changes will allow for up to a
total of four dogs or cats or a combination thereof with the
option to require that two of the four are spayed or neutered.
IN MI
' RIWV - 11 1
with Alexander Films, LLC for
Building located at 227 South
Pollard Street, Vinton, Virginia
0
The Mayor also asked about the approximate schedule of
the streetlights installation in the downtown area. The Town
Manager commented that we had one submission at the bid
opening that was way over budget. After discussing the bid
further with the contractor, we now understand that they
priced putting conduit all over downtown and we already
Dave conduit there. If we are not able to work with this
contractor to get it within budget, we will have to re -bid it.
Mr. Adams asked about an update on the renovations to the
Fire House. The Town Manager responded that the
Roanoke County Board of Supervisors met last Tuesday
and all seemed very supportive of the project. They will put
it back on their September gth agenda to allocate $150,000.
Two weeks ago the contract was signed to complete the i
construction documents which is a five -week process,
The Mayor mentioned that a Proclamation was issued to
Belmont Christian Church for the 11 01h anniversary of the
Church and they will be having their celebration on
September 7th
Joey Hiner, Assistant Public Works Director, announced that
Walnut Avenue between 4 1h and 8th Streets will be closing at
6:00 a.m. on Wednesday, September 3d, for work on the
new bridge and it is expected to be back open on
September 14 1h . The Town Manager commented that we
will be planning a formal ribbon cutting for the actual
opening of the new bridge.
Mr. Nance made a motion to adjourn the meeting; the
motion was seconded by Vice Mayor Hare and carried by
the following vote, with all members voting: Vote 5-0; Yeas
(5) — Adams, Nance, Weeks, Hare, Grose; Nays (0) — None.
The meeting was adjourned at 7:42 p.m, Meeting adjourned
APPROVED:
Bradley E. Grose, Mayor
ATTEST:
EST-
IIRJ�k
7 *
U-od�' "�-qVU/
Susan N. Johnsck Town Clerk