HomeMy WebLinkAbout11/1/2022 - Regular1
Vinton Town Council
Regular Meeting
Council Chambers
311 South Pollard Street
Tuesday, November 1, 2022
AGENDA
Consideration of:
A. 6:00 p.m. - ROLL CALL AND ESTABLISHMENT OF A QUORUM
B. MOMENT OF SILENCE
C. PLEDGE OF ALLEGIANCE TO THE U. S. FLAG
D. UPCOMING COMMUNITY EVENTS/ANNOUNCEMENTS
E. REQUESTS TO POSTPONE, ADD TO OR CHANGE THE ORDER OF AGENDA
ITEMS
F. CONSENT AGENDA
1. Consider approval of the minutes of the Regular Meeting of October 4, 2022
G. AWARDS, INTRODUCTIONS, PRESENTATIONS, PROCLAMATIONS
1. Recognition of Town of Vinton employees who are Veterans – Donna Collins
2. Introduction and Swearing In Ceremony – Chief Drumond
a. Trinity Allen Otey
b. Daniel Marcel Valladarez
c. Stephanie Nicole Walsh
3. Introduction of new employees:
a. Carrie Kessler, Senior Financial Analyst – Andrew Keen
b. Caroline Loveland, Community Programs Coordinator – Chasity Barbour
4. Vinton Historical Society/History Museum Annual Report – Randy Layman,
President, Vinton Historical Society
Sabrina M. McCarty, Vice Mayor
Keith N. Liles, Council Member
Laurie J. Mullins, Council Member
Michael W. Stovall, Council Member
Vinton Municipal Building
311 South Pollard Street
Vinton, VA 24179
(540) 983-0607
2
H. CITIZENS’ COMMENTS AND PETITIONS - This section is reserved for comments and
questions for issues not listed on the agenda.
I. BRIEFINGS
1. Briefing on the Town of Vinton Comprehensive Plan Amendment to Adopt and
Incorporate by Reference the Town of Vinton GAP Summary – Route 24
Bike/Ped Plan, May 2022 – Nathan McClung
2. Update on Public Works projects – Bo Herndon
J. ITEMS REQUIRING ACTION
K. TOWN MANAGER’S PROJECT UPDATES/COMMENTS
L. REPORTS FROM COMMITTEES
M. COUNCIL
N. MAYOR
O. ADJOURNMENT
NEXT COMMITTEE/TOWN COUNCIL MEETINGS:
November 7, 2022 – 3:00 p.m. – Finance Committee Meeting – TOV Conference Room
November 15, 2022 – 6:00 p.m. – Regular Council Meeting – Council Chambers
NOTICE OF INTENT TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT.
efforts will be made to provide assistance or special arrangements to qualified individuals with disabilities
in order to participate in or attend Town Council meetings. Please call (540) 983-0607 at least 48 hours
prior to the meeting date so that proper arrangements may be made.
Meeting Date
November 1, 2022
Department
Town Clerk
Issue
Consider approval of the minutes of the Regular Meeting of October 4, 2022
Attachments
October 4, 2022 minutes
Recommendations
Motion to approve minutes
Town Council
Agenda Summary
1
MINUTES OF A REGULAR MEETING OF VINTON TOWN COUNCIL HELD AT 6:00 P.M.
ON TUESDAY, OCTOBER 4, 2022, IN THE COUNCIL CHAMBERS OF THE VINTON
MUNICIPAL BUILDING LOCATED AT 311 SOUTH POLLARD STREET, VINTON, VIRGINIA
MEMBERS PRESENT: Bradley E. Grose, Mayor
Keith N. Liles
Laurie J. Mullins
Michael W. Stovall
MEMBERS ABSENT: Sabrina McCarty, Vice Mayor
STAFF PRESENT: Pete Peters, Town Manager
Cody Sexton, Assistant Town Manager
Susan N. Johnson, Executive Assistant/Town Clerk
Jeremy Carroll, Town Attorney
Andrew Keen, Finance Director
Fabricio Drumond, Police Chief
Tim Lawless, Deputy Police Chief
Brandon Hill, Police Services Administrator
Anita McMillan, Planning & Zoning Director
Nathan McClung, Assistant Planning & Zoning Director
Donna Collins, Human Resources/Risk Management Director
Chasity Barbour, Community Programs & Facilities Director
The Mayor called the meeting to order at 6:00
p.m. The Town Clerk called the roll with Council
Member Liles,
Member Stovall and Mayor Grose present. Vice
Mayor McCarty was absent
Roll call
After a Moment of Silence, Chasity Barbour led
the Pledge of Allegiance to the U.S. Flag.
the order of agenda items, the Town Manager
requested
Proclamations due to the fact that Quincy Randolph
was not able to attend the meeting.
Council Member Liles made a motion to approve
the Consent Agenda as presented; the motion was
seconded by Council Member Mullins and carried by
the following vote, with all members voting: Vote 4-
0; Yeas (4) – Liles, Mullins, Stovall, Grose; Nays (0)
– None; Absent (1) - McCarty.
Approved minutes of the Regular Meeting
of September 6, 2022
Under awards, introductions, presentations and
proclamations, the next item on the agenda was the
r
receiving re-
2
is the 6th award of accreditation for the Department
and after additional comments, turned the meeting
over to Deputy Chief Lawless.
important and then
Accreditation Manager, Brandon Hill. Mr. Hill was
responsible for maintaining all of the 764 files and
making sure the Department was incompliance with
all standards. Mr. Hill completed the task flawlessly
Manager. Deputy Chief Lawless further commented
on
community, his rating as a Senior Accessor and how
he is quickly progressing to meet the Standards of a
Master Accessor.
Department had a perfect score, which is extremely
difficult to achieve and showed the plaque that was
presented to the Department. After comments from
Council Members and the Mayor, Mr. Hill made
closing comments.
Chief Drumond also commented on a flyer that was
provided to Council on the “Honor the Fallen”
program. The Officers will be growing facial hair for
the month of October and will be donating money to
the First Responders Children Foundation.
The next item on the agenda was the update on
the Community Programs marketing outreach
Chasity Barbour
events: October 8 – 10:00 a.m.- 4:00 p.m. – Fall
Festival - Downtown; October 14 – 7:30 p.m. – VT v.
West Virginia Hockey and October 15 – 7:30 p.m. –
VT v. George Washington – both at Lancer Lot and
Wednesdays – 6:30 p.m. - Bingo; Thursdays – 6:30
p.m. - Trivia; October 8 – 4:00-10:00 p.m. –
Rocktoberfest - all at Twin Creeks Brewery.
Ms. Barbour next commented on the War
Memorial’s participation in the recent Career Quest
sponsored by Virginia Career Works in conjunction
with the Roanoke Regional Partnership, where she
taught 4,000 Seventh Graders table etiquette. She
has signed up for the Spring event for Tenth Graders
and has invited the
Departments to participate.
Ms. Barbour further commented on a two-day
3
participated in through UVA; her current role in
Leadership Roanoke Valley and her participation in
the Smith Mountain Lake Leadership Academy for
2022; the success of the “All Things in Vinton"
produced by RVTV and
engagement at Ferrum College on Growth Mindse
She has also been studying the DiSC assessment
and is certified to teach a two-hour class.
The next item on the agenda was a briefing on
the
Community Rating System (CRS) community
Nathan McClung commented that annually the Town
Federal government and communities that want to
insurance have to participate in the program. The
i
community that live within a flood plain can get a
10% discount on their flood insurance policies and
residents living outside the special flood hazard area
can get a 5% discount as well.
Mr. McClung next commented on the statistics on
contact the Planning & Zoning Departm
receive information about their property as it relates
to floodplains, mitigating risks and any potential
grants that they may be able to apply for.
In response to a question from the Mayor if the
discounts happen automatically or do individuals
have to ask their agent about the discount
their agent.
The next item on the agenda was a briefing on
the
Amendment to Adopt and Incorporate by Reference
the 2022 Town of Vinton Route 24 Bike/Ped Plan
Nathan McClung commented that
and Investment (OIPI) Grant and was completed in
May of
adopt and incorporate the Plan by reference to our
plans that have been completed
reference are the 2018 Roanoke Valley Greenway
Plan, the 2019 UDA Downtown Public Realm Design
Guidelines and Action Plan.
4
It is important to adopt a plan into the
Comprehensive Plan to solidify
recommendations of the Steering Committees, the
public and Town Staff
efforts and more importantly when we apply for
future VDOT, State and Federal Grants, the number
one checkbox to meet is to ensure it is already in a
local or regional plan.
Mr. McClung next commented that there are tools
that can be utilized in different parts of the Town and
project recommendations that we could implement
in certain corridors. Although we would like to see a
over time, we are not tying ourselves to any type of
timeline by adopting this plan, but ensurin
back to in the future when we have a project we can
apply for grant funds.
The Planning Commission will hold at Work Session
and Public Hearing on November 3, 2022 followed
by a Work Session and Public Hearing
November 15, 2022 Council meeting.
The next item on the agenda was to consider
Manager to execute current and future agreements
and any modifications with the Virginia Department
of Transportation (VDOT)
enhancements. Anita McMillan
Council adopted a similar Resolution in 2018 and it
has to be done every four years. Every project that
requires an agreement to be signed by VDOT and
the Town.
Currently we have
advertised and two that are at 60% design. Also, we
hope within a year to begin preliminary engineering
for Phase III of the Glade Creek Greenway which is
from Trailhead Parking off of Gus Nicks Boulevard to
Vinyard Park and is already funded.
Council Member Stovall made a motion to approve
the Resolution
seconded by Council Member Stovall and carried by
the following vote, with all members voting: Vote 4-
0; Yeas (4) – Liles, Mullins, Stovall, Grose; Nays (0)
Adopted Resolution No. 2516 authorizing
the Town Manager to execute current and
The next item on the agenda was to consider
5
Purchasing Policy and Procedures. Andrew Keen
first commented this Resolution is to
increase in some of the spending limits in our current
policy, specifically in the areas of
and professional services.
with our Plann
Projects Manager, we found that with some of the
supply chain issues that have come along with the
pandemic and the inabili
some projects, there is a need to increase the limits
of our professional services to the maximum that the
State allows, which is $80,000 without the necessity
of a formal Request for Proposal (RFP). When our
maximum limit allowed by the State was $30,000.
The recommended changes to the current policy are
under Section 2. Large Purchases, to increase the
professional services from $30,000 to $80,000 and
under Section 3, Professional
$10,000.01 and $30,000 to $20,000 and $80,000.
This will allow the Town Manager to approve these
expenses up to this limit.
Council Member Mullins made a motion to approve
the Resolution
seconded by Council Member Liles and carried by
the following vote, with all members voting: Vote 4-
0; Yeas (4) – Liles, Mullins, Stovall, Grose; Nays (0)
– None; Absent (1) - McCarty.
The Town Attorney commented that Council has the
opportunity to raise the goods and services to
$200,000 from the $100,000 in the current policy
However, the Town Manager has indicated that staff
is not recommending that increase at this time.
Adopted Resolution No. 2517 approving a
new Purchasing Policy and Procedures
The Town Manager expressed appreciation to
Nathan McClung
accomplishment to submit the MS4-Permit.
Collins recently applied and received
through VRSA--
attend a LEAD Program through the Virginia Institute
of Government, which is a similar program to the SEI
Program that he completed this year and the other
grant was for $4,000 to purchase two large ceiling
fans that will go in our Public Works garage bay.
6
The Town Manager also complimented the Police
Department for their accreditation and perfect score
and Chasity Barbour on her presentation.
Under reports from Council Committees,
Andrew Keen
Committee met on September 14
Committee reviewed the item regarding the changes
to the current Purchasing Policy that was approved
by Council earlier in the meeting.
With regard to the preliminary June 30, 2022
Financial Report, the year ended in a positive cash
position with total unrestricted cash available in the
General Fund just shy of $4 million at $3.8 million
and we started the year at $2.3 million. Total
investments,
markets and other investments totals $3.325 million
which is also very strong.
revenue budget was amended several times to take
receiving across the board in all a
amendments, the General Fund still exceeded what
was budgeted by $300,000.
In June, there was a $1.2 million expense deficit
With the $1 million being rolled over in August for the
paving project, this leaves approximately $200,000
funds.
The Utility Fund is still remaining open to assist with
the closure at the end of the year and any of those
funds remaining will be rolled over into the Capital
F
Utility Fund came in less than budgeted for the year.
approve the June 30, 2022 Preliminary Financial
Report as presented; the motion was seconded by
Council Member Mullins and carried by the following
vote, with all members voting: Vote 4-0; Yeas (4) –
Liles, Mullins, Stovall, Grose; Nays (0) – None;
Absent (1) - McCarty.
A
Financial Report
Council Members commented on the recent
7
coming into Town, the recent paving and positive
feedback from citizens on the new lights on Hardy
Road.
The Mayor commented on the Transportation
Workshop and Tour, reminded everyone of the Fall
Festival this coming Saturday
appreciation to the Vinton Baptist Church for sending
pictures that the kids had drawn of services provided
in the Town. The Mayor then announced that it was
Debbie Adams’ birthday and everyone sand Happy
Birthday to her.
Council Member Liles made a motion to adjourn
the meeting; the motion was seconded by Council
Member Mullins
with all members voting: Vote 4-0; Yeas (4) – Liles,
Mullins, Stovall, Grose; Nays (0) – None; Absent (1)
APPROVED:
_________________________________
Bradley E. Grose, Mayor
ATTEST:
_________________________________
Susan N. Johnson, CMC, Town Clerk
Meeting Date
November 1, 2022
Department
Administration
Issue
Recognition of Town of Vinton employees who are Veterans
Summary
Donna Collins, Human Resources/Risk Management Director, will be present to recognize the
Veterans.
Attachments
None
Recommendations
No Action Required
Town Council
Agenda Summary
Meeting Date
November 1, 2022
Department
Police
Issue
Introduction and Swearing In Ceremony – Chief Drumond
a. Trinity Allen Otey
b. Daniel Marcel Valladarez
c. Stephanie Nicole Walsh
Summary
Chief Drumond will introduce three new officers and the Town Clerk will assist with the swearing
in ceremony.
Attachments
None
Recommendations
No Action Required
Town Council
Agenda Summary
Meeting Date
November 1, 2022
Department
Administration
Issue
Introduction of new employees:
a. Carrie Kessler, Senior Financial Analyst – Andrew Keen
b. Caroline Loveland, Community Programs Coordinator – Chasity Barbour
Summary
Andrew Keen and Chasity Barbour will introduce their new employees.
Attachments
None
Recommendations
No Action Required
Town Council
Agenda Summary
Meeting Date
November 1, 2022
Department
Administration
Issue
Vinton Historical Society/History Museum Annual Report
Summary
Randy Layman, President of the Vinton Historical Society, will make this presentation at the
meeting.
Attachments
None
Recommendations
No action required
Town Council
Agenda Summary
Meeting Date
November 1, 2022
Department
Planning and Zoning
Issue
Briefing on the Town of Vinton Comprehensive Plan Amendment to Adopt and Incorporate by
Reference the Town of Vinton GAP Summary – Route 24 Bike/Ped Plan, May 2022.
Summary
The project was conducted by the consultant team in close collaboration with Town staff and the
guidance of two separate steering committees: a Community Steering Committee made up of
Vinton residents and members of elected and appointed committees, and a Technical Steering
Committee made up of Town and regional government staff.
Project activities began with a review of existing project area conditions by the Consultant Team,
including data, physical conditions, and existing planning documents. The project solicited input
from Vinton residents on safety issues and desired bike/ped facilities at both an in-person public
meeting conducted in October 2021 and through an online survey.
Consultants used their experience to create a toolkit of potential bicycle and pedestrian
improvement types for Vinton, using existing conditions information to apply toolkit
improvements to appropriate segments and intersections in the project area. Consultants presented
draft project recommendations to the public at a second public meeting in March 2022.
The Planning Commission will hold its public hearing to adopt the Plan on Thursday, November
3, 2022, and the Town Council public hearing will be held on November 15, 2022.
Attachment
Town of Vinton Route GAP Summary – 24 Bike/Ped Plan
Recommendations
No Action Required
Town Council
Agenda Summary
TOWN OF VINTON GAP SUMMARY
ROUTE 24 BIKE/PED PLAN
MAY 2022Prepared for the Town of Vinton
iTown of Vinton GAP Summary
Route 24 Bike/Ped Plan
TOWN OF VINT O N GAP SUMMAR Y
ROUTE 24 BIKE/PED PLAN
ACKNOWLEDGMENTS
Chasity Barbour, Citizen Representative/Town Community Programs Director
Bob Benninger, Planning Commission/Board of Zoning Appeals Member
Stephanie Brown, Board Executive of the Vinton Area Chamber of Commerce
Fayula Gordon, Associate Planner
Michael Gray, VDOT Planning Manager, Salem District
Mayor Brad Grose, Town Council Representative
Isaac Henry, Roanoke County Transportation Planner
William “Bo” Herndon, Public Works Director
Mary-Beth Layman, Citizen Representative
Nathan McClung, Assistant Planning and Zoning Director
Anita McMillan, Planning and Zoning Director
Carol Moneymaker, VDOT Planning Specialist, Salem District
Sarah Reid, Planning Commission Member
Rachel Ruhlen, Transportation Planner, Roanoke Valley-Alleghany Regional Commission
Janet Scheid, Greenway Commission Chair
Cody Sexton, Assistant Town Manager
Kenny Sledd, Utility Systems Manager
ABOUT GAP-TA
Visit vtrans.org/about/GAP-TA for information about the Growth and Accessibility Planning Technical Assistance program.
CONTACT INFORMATION
Nathan McClung, Assistant Planning and Zoning Director
(540) 283-7009
nmcclung@vintonva.gov
311 St. Pollard St., Vinton, VA 24179
The opinions and conclusions expressed or implied in this report are those of the authors and are not necessarily those of the Office of
Intermodal Planning and Investment (OIPI).
OIPI does not endorse products or manufacturers. Any trade or manufacturers’ names that appear herein are solely because they are
considered essential to the object of the report.
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
CONTENTS
I. Introduction 1
GAP Technical Assistance 1
Study Area and Background 1
Project Process and Activities 1
Steering Committees 1
II. Existing Conditions Analysis 2
Existing VTrans Needs 2
Review of Relevant Plans and Studies 4
Policy Themes 4
Existing Land Uses & Key Destinations 4
Roadway Conditions 6
Bicycle, Pedestrian, and Transit Infrastructure 7
Previously Planned Improvements 10
Summary of Opportunities and Challenges 10
III. Public Involvement 12
Public Meetings 12
Community Survey 12
Steering Committees 12
IV. Toolkit of Bicycle and Pedestrian Improvements 14
Sidewalk Gaps 14
Slow Streets 17
ii
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
CONTENTS
Bicycle Lanes 17
Downtown Toolkit 18
V. Recommendations 19
Identifying Bicycle and Pedestrian Recommendations 19
Prioritization 19
VI. Priority Improvements 25
A: Virginia Avenue Sidewalk (Pollard Street to Vinyard Road)25
B: Intersection Improvements (Pollard Street and Virginia Avenue)26
C: Pollard Street Sidewalks (Virginia Avenue to Cleveland Avenue)26
D: Cleveland Avenue Slow Street (Pollard Street to Bedford Road)27
E: Washington Avenue Lane Reconfiguration (Pollard Street to Bypass Road)28
F: Vinyard Road/Bedford Road Pedestrian Improvements (Cleveland Avenue to Hardy Road)29
VII. Conceptual Project Costs 30
Funding Considerations 31
SMART SCALE 31
Transportation Alternatives Funding 31
Recreation-Oriented Grants 31
Appendix 1: Cost Estimate Breakdowns 32
Appendix 2: Summary of Policy Themes from Prior Plans 36
iii
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
LIST OF TABLES, MAPS, FIGURES, AND APPENDICES
Table 1: 2021 VTrans Mid-Term Needs 2
Table 2: Prioritization Matrix 20
Table 3: Recommended Improvements 22
Table 4: Cost Estimates 30
Map 1: Key Destinations 5
Map 2: Roadway Dimensions 6
Map 3: Average Daily Traffic 7
Map 4: Existing Sidewalks & Bus Stops 8
Map 5: Regional Trails 9
Map 6: Crash Data 10
Map 7: Summary of Input from the Map Survey 13
Map 8: Recommended Improvements 21
Figure 1: Sidewalk Gaps on Multi-Lane Arterial Streets 14
Figure 2: Sidewalk Gaps on Local Streets 15
Figure 3: Signalized Intersection Enhancements 16
Figure 4: Uncontrolled Crossing Enhancements 16
Figure 5: Slow Streets 17
Figure 6: Downtown Streetscapes 17
iv
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
GAP Technical Assistance
The following study was conducted under a Growth and
Accessibility Planning (GAP) technical assistance grant.
Administered by Virginia’s Office of Intermodal Planning and
Investment (OIPI), GAP technical assistance projects seek to
align infrastructure development with designated and emerging
growth areas to improve efficiency and effectiveness. The Town
of Vinton applied for this grant to develop a planning approach
and process to develop a Multimodal Access and Improvement
Study in partnership with Vinton staff, residents, and stakeholders.
The study area includes the entirety of the area between Route
24, Washington Avenue, and South Pollard Street, an area that
includes highly variable land uses from walkable downtown blocks
to neighborhoods and commercial developments. Route 24 is an
important route, not only to the Town of Vinton, but as an important
commuter link in the greater Roanoke area.
Study Area and Background
The study area consists of the central portion of the Town of
Vinton, and is bordered by Washington Avenue to the north,
Bypass Road to the east, East Virginia Avenue/Hardy Road to the
south, and South Pollard Street to the west. It features a variety of
development patterns and land uses, including the Town’s central
business district, a historic residential neighborhood, and multiple
strip-mall styled commercial developments.
This area was chosen for planning purposes due to the important
role that it plays in the community and economic development
efforts of the Town of Vinton. It includes the two major road
corridors that serve the Town of Vinton, as well as five of the town’s
designated Urban Development Areas. The Town of Vinton desires
to improve the accessibility, safety, and efficiency of multimodal
travel in this area to make it more cohesive, and to further serve the
local goals for community services and economic development.
Project Process and Activities
The project was conducted by the consultant team in close
collaboration with Town staff. A project kickoff call was held
on June 23, 2021 between Town of Vinton staff and technical
assistance consultants to review the project scope and carry
out initial discussions, after which bi-weekly project progress
meetings were held virtually between the Consultant Team and
Town staff project managers to guide project activities and review
deliverables. This work was also guided by two separate steering
committees: a Community Steering Committee made up of Vinton
residents and members of elected and appointed committees, and
a Technical Steering Committee made up of Town and regional
government staff.
Project activities began with a review of existing project area
conditions by the Consultant Team, including data, physical
conditions, and existing planning documents. The project solicited
input from Vinton residents on safety issues and desired bike/ped
facilities at both an in-person public meeting conducted in October
2021 and through an online survey.
Consultants used their experience to create a toolkit of potential
bicycle and pedestrian improvement types for Vinton, using
existing conditions information to apply toolkit improvements to
appropriate segments and intersections in the project area.
Consultants presented draft project recommendations to the public
at a second public meeting in March 2022. The team ranked
potential improvements according to traffic stress, community
need, and tactical viability priority criteria to arrive at a short list
of priority projects, adding further detail and conceptual cost
information to selected projects.
Steering Committees
Community Steering Committee
•Chasity Barbour, Citizen Representative/Town Community
Programs Director
•Bob Benninger, Planning Commission/Board of Zoning Appeals
Member
•Stephanie Brown, Board Executive of the Vinton Area Chamber
of Commerce
•Mayor Brad Grose, Town Council Representative
•Mary-Beth Layman, Citizen Representative
•Sarah Reid, Planning Commission Member
•Janet Scheid, Greenway Commission Chair
Technical Steering Committee
•Cody Sexton, Assistant Town Manager
•William “Bo” Herndon, Public Works Director
•Kenny Sledd, Utility Systems Manager
•Anita McMillan, Planning and Zoning Director
•Nathan McClung, Assistant Planning and Zoning Director
•Fayula Gordon, Associate Planner
•Rachel Ruhlen, Roanoke Valley-Alleghany Regional Commission
•Isaac Henry, Roanoke County Transportation Planner
•Carol Moneymaker, VDOT Planning Specialist, Salem District
•Michael Gray, VDOT Planning Manager, Salem District
I. INTRODUCTION
1
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
The development of this report relied on a wide variety of data
sources drawn from the Town of Vinton, Roanoke County, VDOT,
and primary data collected by the consultant team to understand
the existing condition of bicycle, pedestrian, and automotive traffic
in Vinton. The data sets included, among others:
•Future Land Use
•Key Destinations
•Roadway Dimensions
•Vehicular Traffic Volumes
•Sidewalk and Trail Infrastructure
•Existing Bicycle Infrastructure
•Bicycle and Pedestrian Crashes
This analysis of current conditions helps to identify potential types
and locations of improvements and strengthens the connection
between this plan and previous planning efforts.
Existing VTrans Needs
While this project plans for potential bicycle and pedestrian
improvements in the Route 24 area, the area is also subject
to existing transportation needs identified in the 2021 VTrans
Mid-Term Needs. Identified 2021 Mid-Term needs for streets,
intersections, and areas in or near the project area can be found in
Table 1.
II. EXISTING CONDITIONS ANALYSIS
Route Segments Needs
Washington Avenue (Pollard St. to Bypass Rd.)
•Transportation Demand Management
•Transit Access
• Bicycle Access
•Pedestrian Access
•Safety Improvement (Pollard to Poplar, Madison to Mountain
View)
•Intersection Safety Improvement (at Mountain View)
Pollard Street (Washington Ave. to Virginia Ave.)
•Transportation Demand Management
•Transit Access
•Bicycle Access
•Pedestrian Access
•Safety Improvement (Jefferson to Jackson)
E. Virginia Avenue (Pollard St. to Chestnut St.)
•Transportation Demand Management
•Transit Access
•Bicycle Access
•Pedestrian Access
•Safety Improvement
Table 1: 2021 VTrans Mid-Term Needs
2
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Route Segments Needs
Hardy Road (Chestnut St. to Bypass Rd.)
•Transportation Demand Management
•Transit Access
• Bicycle Access
•Pedestrian Access
•Safety Improvement (Spruce to Bypass)
Bypass Rd. (Hardy Rd. to Washington Ave.)
•Transportation Demand Management
•Transit Access
•Bicycle Access
•Pedestrian Access
•Safety Improvement
Areas Needs
Town of Vinton Urban Development Areas (UDAs)
•Roadway capacity
•Roadway operations
•Intersection design
•Street grid
•Safety features
•Traffic calming
•Signage/wayfinding
•Transit frequency
•Transit operations
•Transit capacity
•Transit facilities
•Bicycle infrastructure
•Pedestrian infrastructure
•Complete Streets
•Sidewalks
•On-street parking
•Off-street parking
•Environment
Table 1: 2021 VTrans Mid-Term Needs (cont’d)
3
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Review of Relevant Plans and Studies
The analysis included a review of previous plans and studies that
addressed the area. This review identified many policies and prior
findings that are relevant to multimodal planning for this area. The
relevant studies that were reviewed included:
•Vinton Major Corridors Bicycle and Pedestrian
Accommodations
•Town Of Vinton Comprehensive Plan
•Economic And Community Development Plan
•Vinton Area Corridors Plan
•Gus Nicks Boulevard/Washington Ave Corridor
Improvement Study
•Town Of Vinton Urban Development Areas
•Vinton UDA - Downtown Public Realm Design Guidelines
and Action Plan
•Vision 2040: Roanoke Valley Transportation
•2018 Roanoke Valley Greenway Plan
•Regional Pedestrian Vision Plan
•Roanoke Valley Transit Vision Plan
•Valley Metro Transit Development Plan; Fiscal Years 2019-
2028
•Bikeway Plan for Roanoke Valley Area Metropolitan
Planning Organization 2012 Update
•Roanoke Valley Traffic Congestion Management Process
•Vinton Subdivision Ordinance Revisions Framework
As part of this review, relevant and consistent policy themes were
identified from these prior studies that could serve to guide and
direct the recommendations resulting from this planning process.
A full summary of these themes and policy directions is in the
Appendix to this report.
Policy Themes
Based on the review of prior plans and their policy direction, a
series of five potential goals for this project were identified. These
potential goals were reviewed with the committees and the citizens
of Vinton through a series of outreach efforts to verify and validate
them as the guideposts for future multimodal planning in this area.
The five affirmed goals for this plan are summarized below:
1) Improve Multimodal Travel - Enhance or reconfigure
roadway infrastructure to better accommodate multimodal
travel.
2) Connect Activity Centers - Establish corridors and
services that will provide multimodal connections between
activity centers in the Town of Vinton, as well as to other
destinations in the Roanoke metro area.
3) Connect Neighborhoods to Activities - Make strategic
investments within neighborhoods adjacent to activity centers to
improve the safety and desirability of multimodal access.
4) Reinforce Vinton’s Sense of Place - Support economic
development efforts with placemaking improvements that
enhance visual appearances and pedestrian safety.
5) Maintain Traffic Safety and Efficiency - Maintain the
safe and efficient operation of automotive travel.
Existing Land Uses & Key Destinations
The analysis examined the existing land uses and key destinations
in the study area. The community’s land use patterns determine
which areas generate the most activity and how residents will travel
to and from these places. This, in turn, determines which corridors
will feature the most automobile traffic, and which may be most
suitable to bicycle and pedestrian travel.
In general terms, the study area is characterized by a central
core of residential development surrounded by commercial and
business districts along the major road corridors that serve as the
study area boundary. The western portion of the area features a
traditional downtown commercial district that is centered around
South Pollard Street. The southern and eastern portions of the area,
by contrast, feature strip-mall style commercial developments
that were built along Bypass Road, Hardy Road, and East
Virginia Avenue. Finally, the northern edge of the study area is
characterized by a mixture of residential homes and small, free-
standing businesses along Washington Avenue.
4
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Several important destinations are found in this area, but three stand out as key potential activity generators for multimodal travel.
1) Downtown - The first is Vinton’s downtown central business district located on and around South Pollard Street. This area features
a variety of stores, restaurants, and professional offices, as well as public services such as the town library and municipal building. The
town has identified this area as a key generator of tourism and prime focus of economic development.
2) Lake Drive Plaza Shopping Center and Vinyard Rd Corridor - The second key activity center is the Lake Drive Plaza
shopping center and Vinyard Road corridor located on the south side of Hardy Road. This area features numerous businesses and
restaurants, entertainment venues, and a large grocery store. Though designed to be accessible primarily by car, it also serves as the
endpoint of a Valley Metro fixed bus route line which will feature numerous transit-oriented amenities, such as bus shelters, planned for
construction in the summer of 2022.
3) River Park Shopping Center - The third major activity center in the study is the River Park Shopping Center on the west side of
Bypass Rd. This a smaller shopping center than Lake Drive Plaza Shopping Center, and currently primarily features discount retail stores.
The Town of Vinton supports the redevelopment of this property, however, and intends on encouraging the establishment of a large mixed
use, “town-center” style development at the location in the future.
Other key destinations that should also be considered include the Vinton War Memorial event venue on Washington Avenue, Carilion Clinic
Family Medicine, and W. E. Cundiff Elementary School, which is located a short distance east of the study area on Hardy Road.
Any recommendations produced by this study should carefully consider bicycle and pedestrian accommodations that can be provided in
and around these activity centers. They should also consider ways that the Town of Vinton can establish bicycle and pedestrian routes that
can connect activity centers and residential neighborhoods to each other.
Map 1: Key Destinations
5
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Roadway Conditions
The analysis also examined the traffic conditions and volumes present on the road corridors in the study area. The analysis used readily
available traffic information from the Virginia Department of Transportation, as well as recent aerial images and mapping of the area. The
purpose of this analysis was to understand where additional bike and pedestrian facilities could be accommodated most efficiently with
minimal need for right of way acquisition or road widenings.
Pavement Width
Pavement Widths were analyzed and approximated using aerial imagery. Most of the road corridors in the study area are narrow two-lane
streets with paved travelway widths of approximately 30’ or less. The notable exceptions to this are the highway corridors running along
the northern, southern, and eastern edges of the study area—Washington Avenue, East Virginia Avenue, Hardy Road, and Bypass Road
respectively. These highway corridors feature four lanes of travel and travelway widths of approximately 50’-75’. Center turn lanes with
some medians are provided along East Virginia Avenue, Hardy Road, and Bypass Road.
Parking
On-street parking is provided along many of the streets in the central business district, as well as informally along wider portions of the
adjacent neighborhood streets. On-street parking is not allowed along any of the major highway corridors.
This inventory of existing roadway conditions helps identify where bicycle and pedestrian accommodations could be added or
enhanced most easily, as well as identifying locations where traffic volumes are high that may be need special treatments for multimodal
accommodation.
Map 2: Roadway Dimensions
6
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Traffic
In 2019, VDOT reported traffic volumes generally correspond with the roadway widths and capacities. East Virginia Avenue, Hardy Road,
and most of Washington Avenue average 20,000-25,000 vehicles per day. Bypass Road, by contrast, averages between 10,000-15,000
vehicles per day. All the other roads in the study area average fewer than 10,000 vehicles per day.
Bicycle, Pedestrian, and Transit Infrastructure
This analysis also collected information about bicycle, pedestrian, and transit infrastructure. A sidewalk inventory was provided by the Town
of Vinton, a trail inventory by Roanoke County, and bus stop locations were collected from Valley Metro Transit.
Existing Sidewalks
Sidewalks can be found along many streets in the study area. Sidewalks are provided on both sides of the roadway for most of Washington
Ave and South Pollard St, as well as along Hardy Rd in front of the Lake Drive Plaza shopping center. Sidewalk coverage extends
throughout most of the central business district area, as well as along some of the streets in the Jefferson Park neighborhood. Of note is the
fact that the central business district can be connected to the Lake Drive Plaza shopping center with a continuous sidewalk path on at least
one side of the street using East Cleveland Ave and Bedford Rd. There is, however, a notable lack of sidewalks along East Virginia Ave and
Bypass Rd.
Map 3: Average Daily Traffic
7
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Bus Stops
Additionally, 22 bus stops were identified in the study area. These stops are located along South Pollard Street, Washington Avenue, Bypass
Road, and Hardy Road. As mentioned previously, Lake Drive Plaza shopping center is an important destination, and has been identified
as a potential future small bus transfer station. Sidewalk access is available to most of the bus stops, except for the stops located near the
entrances of the River Park Shopping Center.
This inventory can help identify important gaps in the Town’s existing multimodal infrastructure as well as identify opportunities that can be
expanded to build a stronger multimodal network and foster greater use of alternative modes of transportation.
Source: Valley Metro Transit
Map 4: Existing Sidewalks & Bus Stops
8
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Regional Trails
Existing bicycle infrastructure, by contrast, is very limited in the study area. No bicycle lanes or other formal bicycle markings are found in
the study area. There are nearby off-road trails and roads, however, that are popular with bicyclists, including the Glade Creek Greenway,
Wolf Creek Greenway, and Blue Ridge Parkway. Hardy Road, Walnut Avenue, and Washington Avenue are all commonly used to connect
to these places from the study area.
Crash Data
The analysis also considered bicycle and pedestrian safety data. This information was provided by the VDOT Crash Analyst Tool. The
database used by this tool offers the location of all reported crashes and accidents in the period from 2014-2021. During the reported
period, only one auto accident involving a bicyclist or pedestrian was reported in the study area. This was a pedestrian accident that
occurred on Jefferson Ave and resulted in a severe injury. No accidents involving a bicyclist were reported.
There were, however, three accidents involving bicyclists that occurred just outside of the study area. Two of these occurred on West Virginia
Avenue, a few blocks west of the intersection of East Virginia Avenue and South Pollard Street. One resulted in a severe injury, while the
other resulted in a minor, non-visible injury. The third accident involving a bicyclist occurred on West Lee Avenue, about one block west of
Map 5: Regional Trails
9
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Previously Planned Improvements
Finally, the inventory of existing conditions also included a review
of previous planning and study efforts that have been conducted
in the study area. This area has been the subject of several
previous studies that have produced numerous improvement
recommendations. Some of the recommendations that are most
relevant to the current study effort include:
•The need for pedestrian accommodations at signalized
intersections improvements in general
•The creation of a bicycle boulevard between downtown
Vinton and the River Park Shopping Center
•The reduction of the width of the travel lanes on major road
corridors
•The replacement of some on-street parking with bicycle
lanes.
1) The first recommendation that was identified in multiple studies
was the need to improve pedestrian amenities and infrastructure at
signalized intersections. Studies noted that very few intersections
offer crosswalks or pedestrian countdown signals. It has been
recommended that these elements be added to every signalized
intersection, and that pedestrian refuge islands also be added at
strategic crossing points of four-lane roads.
2) The second recommendation provided by previous studies was
the establishment of a bicycle boulevard between downtown
Vinton and the River Park Shopping Center. This facility would
parallel Washington Avenue and East Virginia Avenue as
an additional east-west route across the study area. It would
provide bicyclists with an alternative route that would avoid the
heavy traffic and high speeds of the major road corridors. This
recommendation also assumed that the River Park Shopping Center
will be redeveloped as a new “town-center” style development
that will generate additional activity and travel to the site.
Map 6: Crash Data
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
3) The third notable recommendation made by previous studies
was to reduce the width of the travel lanes on the major road
corridors to 10’ wide to provide space for bicycle lanes on these
roads. A study of Washington Ave confirms the possibility of “road
diet” treatments on this roadway.
4) Finally, the fourth notable recommendation was to remove on-
street parking along some sections of streets in the central business
district to avoid the potential conflict between bicyclists and parked
cars. These recommendations suggested that marked bicycle lanes
be added in place of the existing on-street parking spaces.
These prior recommendations offer guidance to the current study
effort and provide useful starting points to test in the development
of plan recommendations.
Summary of Opportunities and Challenges
This analysis revealed numerous challenges and opportunities as
benchmarks for consideration in the planning process.
Challenges
One of the primary challenges for improving multimodal travel
in the study area is the lack of existing bicycle and pedestrian
infrastructure. Particularly notable is the complete absence of
bicycle lanes or other formal bicycle markings, as well as the
lack of pedestrian safety amenities at nearly all the signalized
intersections in the study area.
Another challenge for providing multimodal accommodations
is the narrow street dimensions that characterize the historic
neighborhoods in the center of the study area. Narrow streets can
be favorable for non-motorized travel due to their natural tendency
to reduce automobile travel speeds. They also, however, can make
it difficult or unfeasible to add amenities such as bicycle lanes or
sidewalks using the existing right of way.
A third challenge for this study area is the high volume and speed
of traffic that uses the major corridors such as Washington Ave
and East Virginia Ave. These conditions can make bicycle and
pedestrian travel along the corridors unpleasant, and often unsafe.
Their importance as driving routes and their significant traffic
volumes can also make it difficult to successfully propose changes
such as narrowing or repurposing travel lanes to provide room for
sidewalks or bicycle lanes.
Opportunities
Along with these challenges, however, the study area also provides
numerous opportunities that support multimodal travel.
One such opportunity is the existing internal road network that
offers complete, or nearly complete, connections between the
major activity centers. These streets, such as Cleveland Ave
and Bedford Ave, can provide bicyclists and pedestrians with
alternative routes between destinations that avoid larger and
busier road corridors.
Another opportunity is the relatively wide availability of sidewalks
in the study area. While sidewalks are conspicuously absent from
large portions of East Virginia Avenue and Bypass Road, their
availability along South Pollard Street, Washington Avenue, in
front of the Lake Drive Plaza shopping center, and along many
of the internal neighborhood streets provides a solid foundation
to support pedestrian travel in the area. This existing pedestrian
network also allows future improvements to be more focused
on relatively low-cost improvements such as crosswalks and
pedestrian signals, rather than requiring the larger investments of
large sections of new sidewalks.
A third opportunity supporting multimodal travel is the fact that
much of the study area features characteristics of traditional
neighborhood design such as short blocks, buildings located near
to the street, sidewalks, and residential neighborhoods directly
adjacent to commercial developments. All these characteristics
provide a “human-scale” to the study area that supports the ease
and comfort of non-motorized travel.
A final significant opportunity for multimodal travel is the presence
of an existing bus route that serves most of the study area, including
direct service to its three major activity centers. This route not only
provides an alternative mode of transportation to reach these
destinations, but also offers residents of the area with a way to
reach other destinations around the Roanoke metro area without
the need to independently own an automobile.
11
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
The Town of Vinton values the input of its residents and welcomed
public input at several stages in the bicycle and pedestrian
planning process for the Route 24 area.
Public Meetings
In-person public meetings provided one method of public
involvement in the Route 24 bicycle and pedestrian plan. Public
meetings were held both early in the process to solicit public
input and experience, and late in the process to share draft
recommendations for public comment.
Early Engagement
An initial public meeting was held in person at the Vinton War
Memorial on October 4, 2021. The meeting was advertised
extensively through Town of Vinton social media, newspaper
advertisements, and other venues. At this meeting, consultants
presented basic information about the technical assistance grant
and project goals, displayed existing conditions maps and
information, and welcomed public input on their use of, and
desires for, the Route 24 project area. Accompanying the in-person
meeting, a public survey offered an additional input opportunity
at this stage. Input at his stage was used as consultants established
potential improvements and critical needs of the project area.
Late Engagement
A second public meeting was held March 31, 2022, also at
the Vinton War Memorial. Again publicized through the Town’s
existing social media, newspaper advertisements, and other
methods, this meeting presented bicycle and pedestrian toolkit
options and recommended improvements to the public for their
input. The meeting was well-attended and included a presentation
by the Consultant Team and displays of toolkit graphics. Residents
were welcomed to add notes to the overall recommendations map
as well as ask questions of consultants and Town staff. Input at
this stage was used to refine recommended improvements before
project completion.
Community Survey
As a companion to the initial in-person public meeting, the
Consultant Team launched an online survey allowing all residents
an opportunity to engage with the planning process. The survey
presented a map of the project area and asked participants
to mark with four types if information: desired bicycle and
pedestrian destinations, areas with safety concerns, desired bicycle
improvements, and desired pedestrian improvements. Participants
also had the ability to view, comment, and vote on comments
submitted by others. The community survey remained open from
September 9 to November 1, 2021 and was accessed by 340
unique users. Survey results were used extensively in identifying
potential bicycle and pedestrian improvements in the project area.
Steering Committees
Work on the Route 24 Bicycle and Pedestrian Plan was guided
by two separate steering committees, each giving additional
public input to the study effort. A Community Steering Committee
was made up of Vinton residents and members of elected and
appointed committees, including Planning Commission, Town
Council, and Board of Zoning Appeals among others. A Technical
Steering Committee was made up of representatives from local and
regional government, including Town of Vinton representatives from
the Planning and Zoning Department, Public Works Department,
and Town Administration, as well as as well as representatives
from the Virginia Department of Transportation, Roanoke County,
and Roanoke Valley-Alleghany Regional Commission. Steering
Committees met quarterly throughout the study process, providing
local input, vetting draft recommendations, and revising final
deliverables. Steering Committee members also served an
important role in promoting public engagement opportunities.
III. PUBLIC INVOLVEMENT
12
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Map 7: Summary of Input from the Map Survey
This map shows a summary of the locations of comments received by members of the community. Colored pins indicate safety concerns and
needs for bicycle and pedestrian connectivity in the Study Area.
Desired bike/walk destination |Desired bike improvement | Desired walk improvement | Safety concern
13
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
IV. TOOLKIT OF BICYCLE AND PEDESTRIAN IMPROVEMENTS
The GAP technical assistance for Vinton considered a variety of factors in recommending potential bicycle and pedestrian infrastructure
improvements in the Route 24 study area. In consideration of bicycle and pedestrian destinations, pavement widths, traffic volume, existing
sidewalks, and other factors, the Consultant Team constructed a toolkit of potential bicycle and pedestrian improvement types that fit the
scale, character, and needs of Vinton. These toolkit options are based on the experience of other communities and may be used in locations
specified by this study but may also be deployed in other areas of the Town to create a continuous multimodal network serving Vinton on the
region.
Sidewalk Gaps
Sidewalks are the most typical and most familiar method of incorporating pedestrian infrastructure into the transportation network. Vinton
has a significant inventory of existing sidewalks, varying widely in their design. A modern standard for sidewalk construction includes a five-
foot minimum width sidewalk, with appropriate intersection curb ramps meeting requirements of the Americans with Disabilities Act (ADA).
In areas with expectations for higher volumes of pedestrian use, including along multi-lane arterial streets and in established or planned
commercial areas, wider sidewalks are appropriate and should be installed as right-of-way allows, accommodating the wideset variety of
users. While in some areas sidewalks may be separated from the street curb by a landscaped buffer, the realities of Vinton’s existing streets,
rights-of-way, and buildings will make adding sidewalks at the curb edge the most likely scenario. In areas where existing street conditions
are especially difficult, the Town may consider painted sidewalks on existing pavement for limited installations and with approval of
appropriate agencies. In all cases, sidewalks must be coordinated with crosswalks in appropriate locations to create a safe and connected
pedestrian network.
Figure 1: Sidewalk Gaps on Multi-Lane Arterial Streets
14
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Figure 2: Sidewalk Gaps on Local Streets
Intersection Enhancements
Intersections are the most complex and most dangerous elements of the pedestrian transportation system. The goal of all intersection
improvements will be to increase pedestrian and driver safety by increasing pedestrian visibility and reducing the distance pedestrians must
cross.
At intersections with no existing vehicle traffic signals, crosswalk markings that make pedestrians more visible to drivers are a key
improvement. While a wide variety of crosswalk designs exist, this analysis recommends high-visibility crosswalks made up of wide,
longitudinal stripes marked on the roadway at regular intervals. Vehicle stop bars or yield lines that remind drivers to stop well back from
crossing pedestrians also help to increase pedestrian visibility in the street. In addition to painted stripes, accessible curb ramps are required
by the Americans with Disabilities Act (ADA) at all crosswalks. Flashing warning beacons that warn drivers of crossing pedestrians or
pedestrian signals that stop vehicle traffic may be used in especially busy streets. Corner bulb-outs or median refuge islands that reduce the
overall pedestrian crossing distance also enhance safety.
Where crosswalks must cross higher speed or higher volume roadways, or where automobile traffic signals are already in place, signalized
crosswalks are recommended. Signalized crossings may be activated by a pedestrian push button and coordinate pedestrian crossing
timing along with the timing of traffic lights for vehicle travel. Providing a crossing time countdown or prohibiting automobiles from turning
right on red are among additional methods of increasing safety and visibility for pedestrians in the intersection.
15
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Figure 3: Signalized Intersection Enhancements
Figure 4: Uncontrolled Crossing Enhancements
16
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Slow Streets
On many quiet neighborhood streets with low automobile traffic and speeds, it may be possible for pedestrians and vehicles to safely share
the paved street surface. Improvements on these “Slow Streets” can help to reinforce the idea of a safe, shared space for both pedestrians
and drivers. Slow Street improvements may include traffic calming measures such a speed bumps or speed tables, additional signage or
street markings advising drivers of the presence of pedestrians and bicycles, or painted pedestrian zones on the street surface in areas where
separate sidewalks are not feasible due to lack of right-of-way or other limitations.
Figure 5: Slow Streets
Bicycle Lanes
Bicycle lanes are portions of the roadway that has been designated by striping, signage, and pavement markings for the exclusive use of
bicyclists. Bike lanes enable bicyclists to ride at their preferred speed without interference from prevailing traffic conditions and facilitate
predictable behavior and movements between bicyclists and motorists. Bike lanes typically run in the same direction as traffic and are
typically designated with painted lines only, although physical barriers are used in some cases. The configuration of a bike lane requires
consideration of existing traffic levels and behaviors, adequate safety buffers to protect bicyclists from parked and moving vehicles, and
enforcement to prohibit motorized vehicle encroachment and double-parking. Bike Lanes may be distinguished using color, lane markings,
signage, and intersection treatments. Typical bicycle lanes are five feet in width and may be supplemented by a painted buffer zone on
higher volume or higher speed streets to increase safety and comfort.
17
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Downtown Toolkit
As Vinton continues to build the vitality of its downtown core, a variety of improvements can make the area more attractive and comfortable
for pedestrians, including decorative lighting and street furniture, wayfinding signage, and café space.
Figure 6: Downtown Streetscapes
18
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
The GAP technical assistance for Vinton considered a variety
of factors in recommending and prioritizing potential bicycle
and pedestrian infrastructure improvements in the study area.
Consultants reviewed existing long-range planning documents,
conducted a map-based survey and stakeholder meetings for
resident input, and incorporated a wide variety of transportation
network data. Study data included nodes of activity, traffic
volumes, speed, facility design, right-of-way, population density,
employment density, safety criteria, and others.
Taken together, the steps of this process identify individual routes
and projects to form future bicycle and pedestrian networks in
Vinton.
Identifying Bicycle and Pedestrian
Recommendations
To develop a plan for a safe and effective bicycle and pedestrian
network in Vinton, this analysis began by creating an inventory of
key destinations and activity centers in the study area. These were
identified using prior studies and plans, stakeholder meetings,
survey responses, and input from local staff. Downtown Vinton,
Lake Drive Plaza Shopping Center, the River Park Shopping
Center, and the Vinton War Memorial were included among
key destinations for pedestrians and bicyclists. Stakeholders also
expressed interest in improving connections to the Glade Creek
Greenway and Wolf Creek Greenway.
Next, the analysis identified the key street corridors that provide
bicycle and pedestrian access to these destinations, as well as
those that could be used to connect activity centers to one another.
The existing pavement widths, traffic volumes, on-street parking
locations, posted speed limits, and sidewalk facilities for each
key corridor were recorded. This information was used to better
understand the challenges and opportunities for pedestrian and
bicycle travel along each corridor.
Finally, recommendations for bicycle and pedestrian facilities were
assigned to each key corridor. These recommendations varied
depending on both roadway characteristics and anticipated
levels of bicycle and pedestrian use. Some of the recommended
improvements were drawn directly from suggestions offered by the
public, while others were developed by consultants and Town staff.
Prioritization
The previous section described how the recommendations for
bicycle and pedestrian improvements were developed. Part of
the scope for this project also required the development of a
prioritization process to identify high priority recommendations.
The purpose of this process is to be able to use a standard data
analysis to guide the Town’s project prioritization and selection
process. In addition to this data, however, considerations such
as local support or funding feasibility may also be considered as
Vinton leaders advance projects for funding or construction.
All recommended projects were given priority scores in three
categories: Traffic Level of Stress, Community Need, and Tactical
Viability. Brief descriptions of each are provided below:
Traffic Level of Stress
The traffic level of stress evaluation is used to identify corridors
where vehicular traffic creates the most hazardous travel conditions
for bicyclists and pedestrians. Traffic Level of Stress was calculated
using:
•Speed Limit
•Traffic Volume (AADT)
•Number of Travel Lanes
•Recorded Bike/Ped Crashes
Community Need
The community need evaluation is used to identify corridors where
the built environment and demographic conditions are most
likely to create a high demand for bicycle and pedestrian travel.
Community Need was calculated using:
•Proximity to Activity Centers
•Proximity to Schools
•Proximity to Bus Stops
•Bike & Walk Scores
•Population Density
•Employment Density
•VTrans Equity Emphasis Areas
Project Viability
The project viability evaluation is used to identify corridors
where additions or improvements are anticipated to be easiest to
implement. Project viability was calculated using:
•Scale of Corridor
•Right-of-Way Needs
•Connectivity
•Project Readiness
V. RECOMMENDATIONS
19
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Table 2: Prioritization Matrix
20
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Map 7: Recommended Improvements
21
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Segment Start End
Recommended
Corridor
Improvements
Recommended Intersection Improvements Traffic Stress
Rating
Community
Need Rating
Project
Viability
Rating
Notes
S Pollard St Cleveland Ave Virginia Ave Sidewalks - both sides
Signalized Intersection Enhancements at Virginia Ave,
Uncontrolled Crossing Enhancements at Jefferson Ave &
Cedar Ave
med high low
Install 6 ft wide sidewalks on both sides of Pollard
Street. Install ADA curb ramps and high-visibility
crosswalks at crossings.
E Cleveland Ave Pollard St Bedford Rd Slow Street Uncontrolled Crossing Enhancements at Maple, Poplar,
Blair, and Pine Streets low med med Crosswalk, speed table and shared lane marking
improvements for ped/bike slow street
S Blair St E Cleveland Ave Jefferson Ave Slow Street low med med
Jefferson Ave S Blair St Chestnut St Slow Street low med med
Chestnut St Jefferson Ave E Virginia Ave Slow Street Uncontrolled Crossing Enhancements at Hardy Rd low med med
Pine St Washington Ave E Jackson Ave Slow Street low med med
E Cleveland Ave Bedford Rd Dead End Slow Street Intersection Redesign at Bedford Rd low med med Crosswalk, speed table and shared lane marking
improvements for ped/bike slow street
Bedford Rd E Jackson Ave Virginia Ave Slow Street Intersection Redesign at E Cleveland Rd low med high Crosswalk, speed table and shared lane marking
improvements for ped/bike slow street
Bedford Rd Virginia Ave Hardy Rd Sidewalk - one side Signalized Intersection Enhancements at Hardy Rd low med med Add sidewalk or painted walk, alternating sides
E Jackson Ave S Poplar St Pine St Slow Street low med med
S Pollard St Washington Ave E Cleveland Ave Downtown Toolkit
Signalized Intersection Enhancements at Washington Ave
& E Lee Ave, Uncontrolled Crossing Enhancements at E
Jackson Ave & E Cleveland Ave
med high med
S Maple St Washington Ave E Cleveland Ave Downtown Toolkit Uncontrolled Crossing Enhancements at Washington Ave,
E Lee Ave, E Jackson Ave, & E Cleveland Ave low med med
E Jackson Ave W Jackson Ave S Poplar St Downtown Toolkit Uncontrolled Crossing Enhancements at S Pollard St & S
Maple St low med med
Table 3: Recommended Improvements
22
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Segment Start End
Recommended
Corridor
Improvements
Recommended Intersection Improvements Traffic Stress
Rating
Community
Need Rating
Project
Viability
Rating
Notes
E Lee Ave W Lee Ave S Poplar St Downtown Toolkit Signalized Intersection Enhancements at S Pollard St,
Uncontrolled Crossing Enhancements at S Maple St low med med
1st St Walnut Ave W Cleveland Ave Sidewalk low med med
Walnut Ave West Town Limits W Lee Ave Planned/Proposed
Improvements low med med Planned pedestrian and bicycle improvements
already underway
Gus Nicks Blvd Gearhart Park Washington Ave Planned/Proposed
Improvements
Signalized Intersection Enhancements at S Pollard St,
Uncontrolled Crossing Enhancements at W Madison Ave med med low Any lane reconfiguration for Washington Ave. may
be extended on Gus Nicks
Washington Ave S Pollard St Bypass Rd Lane Reconfiguration
Signalized Intersection Enhancements at S Pollard Rd &
Mountain View Rd, Uncontrolled Crossing Enhancements
at S Maple St, S Poplar St, S Blair St, & S Mitchell Rd,
Enhance Existing Crosswalks at Meadow St
med high low
Reconfiguration from four travel lanes to two travel
lanes with shared center turn lane and buffered bike
lanes
Fairmont Dr S Preston Rd Bush Dr Slow Street low low
W Virginia Ave
(Eastbound)Glade Rd Commercial
Driveway Sidewalk Signalized Intersection Enhancements at commercial
driveway high high low
W Virginia Ave
(Westbound)
Commercial
Driveway S Pollard St Sidewalk Signalized Intersection Enhancements at commercial
driveway, 3rd St, & S Pollard St high high low
Hardy Rd
(Westbound)Chestnut St Vinyard Rd Sidewalk
Uncontrolled Crossing Enhancements at Chestnut St
& Spruce St. Signalized Intersection Enhancements at
Bradford Rd
med med low
Bypass Rd Clearview Rd Wishington Ave Sidewalk Uncontrolled Crossing Enhancements at Shopping
Center. Intersection Redesign at Washington Ave med med low
Hardy Rd (Eastbound)Vinyard Rd Clearview Dr Sidewalk Signalized Intersection Enhancements at Bradford Rd med med low
Table 3: Recommended Improvements (cont’d)
23
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Segment Start End
Recommended
Corridor
Improvements
Recommended Intersection Improvements Traffic Stress
Rating
Community
Need Rating
Project
VIability
Rating
Notes
Private Drive E Cleveland Ave Dead End Slow Street low med low Will require coordination with private property
Footpath E Cleveland Ave Bypass Rd Off Road 10 ft Shared
Use Path n/a med low Will require coordination with private property
Footpath Bypass Rd Fairmont Dr Off Road 10 ft Shared
Use Path n/a med low Will require coordination with private property
Footpath Fairmont Dr Wolf Creek
Greenway
Off Road 10 ft Shared
Use Path n/a med low Will require coordination with private property
Hardy Rd (Westbound)Vinyard Rd Clearview Dr Sidewalk Signalized Intersection Enhancements at Bradford Rd med med low
Hardy Rd Clearview Rd Nelson St Sidewalk med low low
Washington Ave Mitchell Rd Bypass Rd Sidewalk med med low
Add sidewalk on south side of Washington, joining
with proposed sidewalks on west side of Bypass
Road
W Lee Ave Walnut Ave E Lee Ave Downtown Toolkit Signalized Intersection Enhancements at S Pollard St low med med
W Jackson Ave Walnut Ave E Jackson Ave Downtown Toolkit Uncontrolled Crossing Enhancements at S Pollard St low med med
W Cleveland Ave 1st St Pollard St Slow Street Uncontrolled Crossing Enhancements at S Pollard St low med med
E Virginia Ave
(Westbound)S Pollard Chestnut St Sidewalk
Signalized Intersection Enhancement at S Pollard St.
Uncontrolled Crossing Enhancements at Chestnut St &
Spruce St
med med med
E Jackson Ave Pine St Bedford Rd Slow Street Intersection Redesign at E Cleveland Rd low med med
Table 3: Recommended Improvements (cont’d)
24
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
VI. PRIORITY IMPROVEMENTS
The following is a list of high priority projects based on the recommendations and prioritization criteria in Section V.
A: Virginia Avenue Sidewalk (Pollard Street to Vinyard Road)
East Virginia Avenue and Hardy Road form a key commercial corridor and link between Vinton’s downtown and shopping, restaurants, and
other services in the area of Hardy Road and Vinyard Road. Future redevelopment of the corridor may continue to add business uses and
pedestrian destination. Despite the importance of this corridor to the overall transportation and land use network in Vinton, no sidewalks are
currently provided. Installation of a sidewalk on the north side of East Virginia Avenue can provide a key pedestrian connection in this area.
Recommended Improvements:
•Install continuous 5-foot wide sidewalk on north side of East Virginia Avenue / Hardy Road
•Provide high-visibility crosswalks, with appropriate curb ramps, at existing and future street crossings and major commercial entrances
25
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
B: Intersection Improvements (Pollard Street and Virginia Avenue)
The intersection of Pollard Street with Virginia Avenue is a key point of transition between Virginia Avenue’s important commercial corridor
and Pollard Street’s downtown streetscape. The Town has already completed pedestrian upgrades at other key intersections, including
the Pollard Street’s northern intersection with Washington Avenue. Intersection upgrades will safely integrate pedestrians into an existing
signalized automobile intersection. With potential development, improvements can serve this growing area and should be coordinated with
development work if possible.
Recommended Improvements:
•Provide high-visibility crosswalks, with appropriate curb ramps, at crossings of Pollard Street, First Street, East Virginia Avenue, and
West Virginia Avenue
•Modify existing medians on Virginia Avenue to allow safe pedestrian crossing
•Install button-activate pedestrian signals coordinated with existing vehicle traffic signals
C: Pollard Street Sidewalks (Virginia Avenue to Cleveland Avenue)
Pollard Street is the critical center of Vinton’s downtown and path to connect to downtown businesses and other uses. Pollard Street has
already seen sidewalk improvements north of Cleveland Avenue as a part of streetscaping efforts and library construction. The segment of
Pollard Street from Virginia Avenue to Cleveland Avenue can provide key continuity to Virginia Avenue commercial uses and potential new
development in this area. While this segment of Pollard Street currently includes sidewalks, these walks are narrower than current standards,
in general disrepair, and do not meet modern accessibility requirements of the Americans with Disabilities Act (ADA).
Recommended Improvements:
•Widen sidewalks to 6-feet on both sides of Pollard Street from Virginia Avenue to Cleveland Avenue
•Add high-visibility crosswalks and ADA curb ramps at crossings of Cedar Avenue and Jefferson Avenue
26
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
D: Cleveland Avenue Slow Street (Pollard Street to Bedford Road)
East-west bicycle and pedestrian travel in the Route 24 study are complicated by high traffic on the area’s major east-west routes,
Washington Avenue and Virginia/Hardy. Cleveland Avenue provides one route option to make east-west connections through the study
area on a lower-traffic street, and to engage the residential neighborhood internal to the study area in the bike/ped transportation network.
Slow Streets are streets with low traffic where a combination of traffic calming, signage, and other visibility improvements can create a safer
space for bicycles, pedestrians, and automobiles to share one corridor. While Cleveland Avenue does not currently have sidewalks on both
sides of all blocks, sidewalks are available on at least one side of the street for the full length of this segment. Topographic issues will make
the addition of new sidewalks complex. The recommendations included here do not include new sidewalks, but additional sidewalks may be
considered by the Town in the long term.
Recommended Improvements:
•Install one traffic calming speed table per block between Maple Street and Bedford Road
•Add high-visibility crosswalks and ADA curb ramps at crossings of Maple Street (north side), Poplar Street (north and east sides), Blair
Street (north and west sides), and Pine Street (south side)
•Paint bicycle shared lane markings (sharrows) approximately every 200 to 250-feet from Pollard Street to Bedford Road.
27
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
E: Washington Avenue Lane Reconfiguration (Pollard Street to Bypass Road)
Washington Avenue is a key Vinton corridor and pass-through corridor for many commuters. The existing corridor provides two vehicle lanes
in each direction, and high volume of traffic that may deter bicyclists. Washington presents an opportunity for a “road diet” or reduction in
overall lanes to provide a more complete street that accommodates bicycle travel. While ample space is available for reconfiguration of
existing lanes, additional study of existing and projected traffic volumes will be necessary before installation of improvements.
Recommended Improvements:
•Restripe Washington Avenue from Pollard Street to Bypass Road, reconfiguring from four travel lanes to one travel lane in each
direction (11-foot widths) with a center turn lane (12-foot width) and two buffered bike lanes (5-foot lane with 3-foot painted buffer)
•Provide appropriate transitions at east and west corridor ends where the reconfigured segment reverts to other lane designs
•Reposition traffic signal heads as necessary
28
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
F: Vinyard Road/Bedford Road Pedestrian Improvements (Cleveland Avenue to Hardy Road)
Bedford and Vinyard Roads provide an important connection from residential areas internal to the study area to shopping and services in the
area of Vinyard and Hardy. The Town of Vinton has previously improved the intersection of Vinyard Road and Hardy Road with pedestrian
accommodations, but Vinyard itself does not provide pedestrian facilities.
Recommended Improvements:
•Install one traffic calming speed table per block between Cleveland Avenue and Hardy Road
•Provide high-visibility crosswalks, with appropriate curb ramps, at existing and future street crossings and major commercial entrances
•Paint bicycle shared lane markings (sharrows) approximately every 200 to 250-feet from Cleveland Avenue to Hardy Road
•Install 5-foot sidewalk on west side of Vinyard from Bedford Road to south of existing restaurant entrance, relocating the existing curb
approximately 2.5-feet east and acquiring approximately 2.5-feet of right-of-way from adjacent properties. Alternatively, paint 5-foot
on-street pedestrian walkway within existing pavement depending on right-of-way and pavement width available.
•Install 5-foot sidewalk on east side of Vinyard from existing restaurant entrance to Hardy Road
29
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
For each selected project the Consultant Team has constructed a conceptual estimate of project cost. Cost estimates are based on typical
costs for individual construction elements including sidewalks, road markings, ADA curb ramps, and pedestrian signals, along with
engineering, construction mobilization, and contingency costs. Typical costs have been drawn from regional sources, including recent
construction projects in Vinton. While efforts have been made to recommend projects within existing rights-of-way, the cost of any necessary
right-of-way acquisition have not been included.
The conceptual cost estimates provided in this document will aid the Town in budgeting for capital projects or seeking grants and outside
funding. Importantly, project costs can vary widely depending on many factors. Specific engineering of individual projects may uncover
issues that change project costs. Construction costs will also vary over time. The conceptual estimates included here should not be relied
upon beyond six months from the publication of this document.
VII. CONCEPTUAL PROJECT COSTS
Selected Project Location Recommendation Conceptual Cost
A. Virginia Avenue
Sidewalk
Pollard Street to
Vinyard Road
Install conventional sidewalk on north side
of street $2,535,944
B. Intersection
Improvements
(Pollard Street and
Virginia Avenue)
Install crosswalks, ADA curb ramps,
modified medians, and pedestrian crossing
signals
$194,231
C. Pollard Street
Sidewalks
Virginia Avenue to
Cleveland Avenue
Widen sidewalks to 6-foot width, ADA
curb ramps, and crosswalks $1,634,473
D. Cleveland Avenue
Slow Street
Pollard Street to
Bedford Road
Install crosswalks, speed tables, ADA curb
ramps, and sharrows $301,610
E. Washington
Avenue Lane
Reconfiguration
Pollard Street to
Bypass Road
Reconfigure four-lane road to two lanes
with center turn and buffered bicycle lanes $1,671,912 (includes milling and paving)
F. Vinyard Road/
Bedford Road
Improvements
Cleveland Avenue to
Hardy Road
Install crosswalks, speed tables, ADA curb
ramps, sharrows, and conventional or
painted sidewalks
$196,556 (painted sidewalk option)
$402,729 (conventional sidewalk option)
Table 4: Cost Estimates
30
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Funding Considerations
These projects can be funded through a variety of sources and those sources can often be combined to ensure full project completion. The
following section outlines potential sources of funding for bicycle and pedestrian projects and notes about each source.
SMART SCALE
SMART SCALE is the one of the most prominent sources of funding for transportation projects in the Commonwealth of Virginia. As of 2022,
the program is in its fifth round and it is administered through the Office of Intermodal Planning and Investment (OIPI) with the assistance
of the Virginia Department of Transportation (VDOT) and Department of Rail and Public Transportation (DRPT). It is a highly competitive
program and projects are scored and the scores are relative to other projects in the VDOT district (in Vinton’s case, that is the Salem District).
There are a variety of factors that make projects competitive but adding bicycle and pedestrian elements to other projects potentially
improves their scoring. For example, if a locality would like to pursue SMART SCALE for intersection improvements, the addition of bicycle
and pedestrian facilities identified in planning documents increases the multimodality of the project and may make it more competitive.
Vinton can refer to this plan when considering larger transportation (intersection or corridor) projects for opportunities to fund bicycle and
pedestrian infrastructure.
Note that not all recommended projects may be eligible for SMART SCALE funds. While SMART SCALE may be ideal for establishing
new sidewalks or bicycle facilities, this funding source may not support widening sidewalks were sidewalks already exist, or adding other
streetscaping elements.
Transportation Alternatives Funding
The Transportation Alternatives Program (TAP) provides for construction and design of bicycle and pedestrian facilities through a formula
program administered by VDOT. The program is intended to help localities fund projects that expand non-motorized travel choices centered
around cultural, historical, and environmental resources.
Surface Transportation Block Grant Funding
The Surface Transportation Block Grant Program: Roanoke Valley Urbanized Area Suballocation Funding (STBG) provides federal funding
that may be used by for a wide range of highway, transit, and other transportation projects. The Roanoke Valley Transportation Planning
Organization (RVTPO) administers this funding, with the Policy Board responsible for project selection and allocation of approximately
$6M/year for the Roanoke region.
New project applications have been accepted in the Spring 2013 (Round 1), September 2014 (Round 2), September 2017 (Round 3),
September 2019 (Round 4), and September 2021 (Round 5). It is anticipated that new project applications will be accepted every other
year, with the next round of applications due in September 2023.
Recreation-Oriented Grants
The Virginia Department of Conservation and Recreation (DCR) offers a number of grant programs but two programs that may assist in
some of the off-road paths and trails is its Trail Access Grant program and the Recreational Trails Program. The former is a 100 percent
reimbursement program for trail projects and projects that increase access to trails for individuals with disabilities. The latter is a matching
program aimed at building and rehabilitating trails and acquiring land for trail corridors. These programs are potential funding options for
connecting to Vinton and Roanoke area greenways.
31
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Appendix 1: Cost Estimate Breakdowns
32
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Appendix 1: Cost Estimate Breakdowns (cont’d)
33
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Appendix 1: Cost Estimate Breakdowns (cont’d)
34
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Appendix 1: Cost Estimate Breakdowns (cont’d)
35
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Appendix 2: Summary of Policy Themes from Prior Plans
36
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Appendix 2: Summary of Policy Themes from Prior Plans (cont’d)
37
Town of Vinton GAP Summary
Route 24 Bike/Ped Plan
Town of Vinton Gap Summary
Route 24 Bike/Ped Plan
Meeting Date
November 1, 2022
Department
Public Works
Issue
Update on Public Works projects
Summary
Bo Herndon, Public Works Director, will give an update on the following projects:
• Signal Update
• Hardy Road Street Light Update
• Paving Update
• Striping
• Garthright Bridge Update
Attachments
None
Recommendations
No action required